Installer manual Fleck 9000 SXT - Maintenance
94 / 118
Ref. MKT-IM-020 / C - 21.11.2019
9.4.11
Valve on tank assembly
1. Lubricate the seals with approved silicone grease.
2. Spin the valve (
1
) onto the tank (
2
), ensuring the threads are not cross-threaded.
3. Rotate the valve (
1
) clockwise and freely, without using force until it comes to a stop.
Info
This stop position is considered point zero.
4. Rotate the valve (
1
) clockwise from point zero to between ¼ turn and ½ turn.
Caution - material
Risk of damage due to excessive force !
Do NOT exceed 27 Nm of torque when installing the valve. Exceeding this limit may
damage the threads and cause failure.
Point 0
½ turn
Point 0
¼ turn
Point 0
½ turn
Point 0
¼ turn
Содержание FLECK 9000 SXT
Страница 1: ...FLECK 9000 SXT INSTALLER MANUAL WATER PURIFICATION...
Страница 20: ...Installer manual Fleck 9000 SXT Description 20 118 Ref MKT IM 020 C 21 11 2019 3 4 Outline drawing...
Страница 78: ...Installer manual Fleck 9000 SXT Maintenance 78 118 Ref MKT IM 020 C 21 11 2019...
Страница 80: ...Installer manual Fleck 9000 SXT Maintenance 80 118 Ref MKT IM 020 C 21 11 2019...
Страница 82: ...Installer manual Fleck 9000 SXT Maintenance 82 118 Ref MKT IM 020 C 21 11 2019...
Страница 85: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 85 118...
Страница 87: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 87 118...
Страница 89: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 89 118...
Страница 92: ...Installer manual Fleck 9000 SXT Maintenance 92 118 Ref MKT IM 020 C 21 11 2019...
Страница 118: ...www pentairaquaeurope com...