Installer manual Fleck 9000 SXT - Programming
Ref. MKT-IM-020 / C - 21.11.2019
59 / 118
6.5.13
Regeneration cycle step duration
Set the duration in minutes of each regeneration cycle.
Info
Setting a cycle step to 0 will cause the controller to skip that step during regeneration,
but keeps the following steps available.
The different regeneration cycles are listed in sequence based on the regeneration
flow selected for the system.
All cycles can be set from 0 to 199 minutes.
6.5.13.1
Regeneration abbreviations
B1
First backwash
BF
Brine fill
B2
Second backwash
BW
Backwash
BD
Brine draw
RR
Rapid rinse
6.5.13.2
For pre-set regeneration cycles
1. Press
or
to set the regeneration cycle time.
2. Press
to validate the selection and move to the next
parameter.
3. Repeat the two previous steps for each cycle.
6.5.13.3
For regeneration flow Other
Info
The regeneration cycles are identified as R1 to R6.
1. Press
or
or to set the regeneration time of this cycle.
2. Press
to validate the selection and move to the next
regeneration cycle.
3. Repeat the two previous steps for each cycle.
Содержание FLECK 9000 SXT
Страница 1: ...FLECK 9000 SXT INSTALLER MANUAL WATER PURIFICATION...
Страница 20: ...Installer manual Fleck 9000 SXT Description 20 118 Ref MKT IM 020 C 21 11 2019 3 4 Outline drawing...
Страница 78: ...Installer manual Fleck 9000 SXT Maintenance 78 118 Ref MKT IM 020 C 21 11 2019...
Страница 80: ...Installer manual Fleck 9000 SXT Maintenance 80 118 Ref MKT IM 020 C 21 11 2019...
Страница 82: ...Installer manual Fleck 9000 SXT Maintenance 82 118 Ref MKT IM 020 C 21 11 2019...
Страница 85: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 85 118...
Страница 87: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 87 118...
Страница 89: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 89 118...
Страница 92: ...Installer manual Fleck 9000 SXT Maintenance 92 118 Ref MKT IM 020 C 21 11 2019...
Страница 118: ...www pentairaquaeurope com...