Installer manual Fleck 9000 SXT - Commissioning
66 / 118
Ref. MKT-IM-020 / C - 21.11.2019
Do not let the disinfectant stand for more than 3 hours in the brine tank before the regeneration
start.
Dosage
Measure two grains ~ 0.11 mL for 1 L.
Brine tank softeners
Backwash the softener and add the required amount of hypochlorite to the well of the brine tank.
The brine tank should have water in it to permit the chlorine solution to be carried into the
softener.
Proceed with the normal regeneration.
7.2.3
Electro chlorination
Valves or systems already equipped with an electrochlorinator device or system will be sanitized
during the brine draw phase.
Содержание FLECK 9000 SXT
Страница 1: ...FLECK 9000 SXT INSTALLER MANUAL WATER PURIFICATION...
Страница 20: ...Installer manual Fleck 9000 SXT Description 20 118 Ref MKT IM 020 C 21 11 2019 3 4 Outline drawing...
Страница 78: ...Installer manual Fleck 9000 SXT Maintenance 78 118 Ref MKT IM 020 C 21 11 2019...
Страница 80: ...Installer manual Fleck 9000 SXT Maintenance 80 118 Ref MKT IM 020 C 21 11 2019...
Страница 82: ...Installer manual Fleck 9000 SXT Maintenance 82 118 Ref MKT IM 020 C 21 11 2019...
Страница 85: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 85 118...
Страница 87: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 87 118...
Страница 89: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 89 118...
Страница 92: ...Installer manual Fleck 9000 SXT Maintenance 92 118 Ref MKT IM 020 C 21 11 2019...
Страница 118: ...www pentairaquaeurope com...