Ref. MKT-IM-020 / C - 21.11.2019

9.4.7.2

Valve produced before November 2009

Info

The seal & spacer cartridge for downflow and upflow are different.

Caution - material

Risk of damage due to wrong lubricant use !

Do not use petroleum-based lubricants such as vaseline, oils, or hydrocarbon-based
lubricants.

Use only approved silicone grease or soapy water !

1. Remove the lower piston, see Lower piston and/or front side seal and spacer kit replacement

[

}

Page 81].

2. Using a 8 mm wrench or flat screwdriver, unscrew (

3

) and remove the end cap (

4

).

3. Remove the sub end plug (

5

).

4. Using a small hook, remove a seal (

6

).

5. Using the puller (

1

), remove a spacer (

7

).

6. Repeat the two previous steps for all the seals and spacers.

7. Lubricate all seals (

6

) with approved lubricant only.

8. Put back a new seal (

6

) using the stuffer (

2

).

9. Put back the new plain spacer (

8

) using the stuffer (

2

).

10. Put back a new seal (

6

) using the stuffer (

2

).

11. Put back a new spacer (

7

) using the stuffer (

2

).

12. Repeat the two previous steps for all the seals and spacers.

13. Put back the sub end plug (

5

).

14. Put back the end cap (

4

) and screw (

3

) using an 8 mm wrench or flat screwdriver.

15. Put back the lower piston, see Lower piston and/or front side seal and spacer kit

replacement [

}

Page 81].

Содержание FLECK 9000 SXT

Страница 1: ...FLECK 9000 SXT INSTALLER MANUAL WATER PURIFICATION...

Страница 2: ...y pictograms definition 12 2 2 Serial label location 13 2 3 Hazards 13 2 3 1 Personnel 13 2 3 2 Material 14 2 4 Hygiene and sanitization 14 2 4 1 Sanitary issues 14 2 4 2 Hygiene measures 14 3 Descrip...

Страница 3: ...4 Mechanical 38 5 4 Integration constraints 38 5 5 Valve connection to piping 39 5 5 1 Top mounted valve installation 39 5 6 Block diagram and configuration example 41 5 7 Regeneration flows 42 5 8 E...

Страница 4: ...ation HR 62 6 6 5 Volume since last regeneration VU 62 6 6 6 Reserve capacity RC 62 6 6 7 Software version SV 63 6 7 Resetting the controller 63 6 7 1 Soft reset SR 63 6 7 2 Hard reset HR 63 7 Commiss...

Страница 5: ...4 8 Micro switches replacement 90 9 4 9 Injector cleaning 91 9 4 10 BLFC cleaning 93 9 4 11 Valve on tank assembly 94 10 Troubleshooting 95 10 1 Error detection 98 10 1 1 Motor stall cam sense error 9...

Страница 6: ...Installer manual Fleck 9000 SXT Table of Contents 6 118 Ref MKT IM 020 C 21 11 2019 11 12 Other components list 115 12 Disposal 117...

Страница 7: ...ollowed This manual is a reference and will not include every system installation situation The person installing this equipment should have training in the Fleck series SXT controllers and water soft...

Страница 8: ...Controller HW Hot Water Inj Injector N A Not Available NBP No By Pass PN Part Number QC Quick connect Regen Regeneration S S Seals Spacers SBV Safety Brine Valve STD Standard SM Side Mounted Sys Syste...

Страница 9: ...at this list is not an exhaustive list of all our certifications In case of need for more information please contact us 1 7 Procedure for technical support Procedure to follow for any technical suppor...

Страница 10: ...per or wrong connection assembly of systems or products with this product and vice versa use of a non compatible lubricant grease or chemicals of any type and not listed by the manufacturer as compati...

Страница 11: ...nstantaneously access to all updated information related to the product such as valve s and tanks detailed configuration manuals spare parts lists troubleshooting recommendations multi lingual videos...

Страница 12: ...ord indicates a potentially hazardous situation that can result in serious or fatal injury if not avoided CAUTION This combination of symbol and keyword indicates a potentially hazardous situation tha...

Страница 13: ...any other legal regulations accident prevention and environmental protection measures as well as any recognized technical regulations relating to appropriate and risk free methods of working which ap...

Страница 14: ...manual regenerations in order to clean the media bed During such operations do not use the water for human consumption Perform a disinfection of the system in the case of installations for treatment o...

Страница 15: ...5 40 C Flow rates 3 5 bar inlet valve only 1 Continuous service flow p 1 bar 4 m3 h 4 7 m3 h Peak service flow p 1 8 bar 5 4 m3 h 6 3 m3 h Cv 4 8 gpm 5 1 gpm Kv 4 m3 h 4 3 m3 h Maximum backwash flow p...

Страница 16: ...Hz 0 5 A Class II Transient overvoltages within the limits of category II Pollution Degree 3 Temporary overvoltages must be limited in duration and in frequency Environmental conditions Indoor use onl...

Страница 17: ...It also allows to determine the valve pressure drop at a given flow rate and therefore to evaluate the system pressure drop vs flow rate FLOW RATE VS PRESSURE DROP Service 1 Backwash Flow rate m h Pre...

Страница 18: ...Tank 2 in Service Tank 1 in Brine draw slow rinse Tank 2 in Service Tank 1 in Fast Rinse Tank 2 in Service Tank 1 in Tank Refill Tank 2 in Service Tank 1 in Standby Tank 2 in Service Tank 2 in Tank Re...

Страница 19: ...slow rinse Tank 2 in Service Tank 1 in Backwash Tank 2 in Service Tank 1 in Fast Rinse Tank 2 in Service Tank 1 in Tank Refill Tank 2 in Service Tank 1 in Standby Tank 2 in Service Tank 2 in Tank Ref...

Страница 20: ...Installer manual Fleck 9000 SXT Description 20 118 Ref MKT IM 020 C 21 11 2019 3 4 Outline drawing...

Страница 21: ...MKT IM 020 C 21 11 2019 21 118 3 5 Components description and location Controller LCD screen Up button Regen button Camshaft Down button Motor Micro switches Flexible tube Second tank adapter Brine li...

Страница 22: ...e draw slow rinse cycles C2 The valve directs water through the brine injector and brine is drawn from the brine tank The brine is then directed down through the resin bed and up through the riser tub...

Страница 23: ...et Inlet Inlet Outlet Drain Valve Valve SERVICE NORMAL USE C1 BACKWASH Outlet Inlet Inlet Outlet Drain Drain Valve Valve C2 BRINE DRAW SLOW RINSE C3 RAPID RINSE From brine tank Outlet Inlet Inlet Outl...

Страница 24: ...sodium ions and are sent to the drain The resin is regenerated during the brine cycle Then the slow rinse phase starts Backwash cycle C2 The flow of water is reversed by the valve and directed down t...

Страница 25: ...utlet Inlet Inlet Outlet Drain SERVICE NORMAL USE C1 BRINE DRAW SLOW RINSE Outlet Inlet Inlet Outlet Drain Drain C2 BACKWASH C3 RAPID RINSE Outlet Inlet Inlet Outlet C4 BRINE REFILL SERVICE NORMAL USE...

Страница 26: ...2 1 Parameters to be considered Whenever installing a softener it is preferable to have full water analysis to ensure the inlet water content will not affect the resin bed Tip Please consult your resi...

Страница 27: ...r and temperature 16 C is Piping size internal diameter Max flow rate in mm m3 h at 3 m s 0 5 12 1 22 0 75 20 3 39 1 25 5 73 1 25 32 8 69 1 5 40 13 57 2 0 50 21 20 2 5 63 34 2 3 0 75 49 2 4 2 2 Determ...

Страница 28: ...ty of the unit can be expressed in different ways the mass capacity which corresponds to the weight in equivalent CaCO3 that can be fixed on the resin expressed in kg as CaCO3 the volume capacity whic...

Страница 29: ...esin L Ccor resin ex corresponding resin exchange capacity f m3 l or dH m3 l To calculate the system volume capacity Vcapacity Mcapacity THinlet Or Vcapacity Ccapacity THinlet with Vcapacity system vo...

Страница 30: ...rough the injector nozzle to create the suction effect QInj 4 x BV h with Qinj total flow rate passing through the injector L h BV bed volume of resin L Info This value does not correspond to the brin...

Страница 31: ...ne draw brine draw duration min Vbrine brine volume to be drawn L see Refill calculation Page 32 Qdraw injection draw flow rate L min Tip Multiply the amount of salt in kg by 3 to get a approximation...

Страница 32: ...rolled by the refill controller BLFC The relation between the BLFC size the tank size and the resin volume is given in the valve specifications To calculate the refill duration Trefill VWB QBLFC with...

Страница 33: ...KT IM 020 C 21 11 2019 33 118 4 4 1 1600 injectors INJECTOR 0 Total Rinse Draw Flow rate l min Inlet pressure bar Rinse Draw INJECTOR 1 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 2 T...

Страница 34: ...34 118 Ref MKT IM 020 C 21 11 2019 INJECTOR 3 Total Rinse Draw Flow rate l min Inlet pressure bar 4 4 2 1650 injectors INJECTOR 0 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 1 Total...

Страница 35: ...taller manual Fleck 9000 SXT System sizing Ref MKT IM 020 C 21 11 2019 35 118 INJECTOR 2 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 3 Total Rinse Draw Flow rate l min Inlet pressure...

Страница 36: ...he device please ensure to have disconnected the transformer from the power source to shut off inlet water supply to the valve and to drain water pressure opening a tap down line of the valve 1 Be car...

Страница 37: ...1 4 bar dynamic pressure on injector of water pressure is required for the regeneration valve to operate effectively Mandatory Do not exceed a maximum of 8 6 bar inlet pressure In such cases it is ne...

Страница 38: ...mm in diameter Use 19 mm pipe if the backwash flow rate is greater than 26 5 lpm or the pipe length is greater than 6 m do not support the weight of the system on the valve fittings plumbing or the b...

Страница 39: ...vertically and circumferential In order to compensate the vertical expansion the piping connections to the valve must be flexible enough to avoid overstress on the valve and tank 5 5 1 Top mounted val...

Страница 40: ...ng semi flexible piping failure to provide enough vertical compensation may lead to different kinds of damage either on the valve thread which is connected to the tank or on the female thread connecti...

Страница 41: ...tegrated in the valve Pressure gauge Valve Resin tank Filter cartridge Main inlet Pressure regulator Suggested options Check valve to prevent water harm By pass Meter Drain line Brine line Brine tank...

Страница 42: ...city for the next operation day a regeneration cycle will be initiated immediately or at a pre set time immediate control the controller measures water usage and regenerates the system as soon as the...

Страница 43: ...allation Ref MKT IM 020 C 21 11 2019 43 118 5 8 Electrical connections Valve motor Transformer W1 Black W2 Red W3 Green W4 Yellow W5 White W6 Blue W7 Orange W8 Violet c Common NC Normally closed NO No...

Страница 44: ...to bad mounting Do not solder pipes with lead based solder Do not use tools to tighten plastic fittings Over time stress may break the connections Do not use petroleum grease on gaskets when connectin...

Страница 45: ...the run does not exceed 4 6 m and water pressure at the softener is not less than 2 76 bar Elevation can increase by 61 cm for each additional 0 69 bar of water pressure at the drain connector Where t...

Страница 46: ...n the side of the tank Insert the overflow fitting into the tank and tighten with plastic thumb nut and gasket as shown below Attach a 12 7 mm I D tubing not supplied to fitting and run to drain Do no...

Страница 47: ...hoses may shrink because of the vacuum during brine draw The brine line from the tank connects to the valve Make the connections and hand tighten Be sure that the brine line is secure and free from ai...

Страница 48: ...Diagnostic Page 61 3 Parameter display Master programming and diagnostic modes C Unit capacity CD Current day CT Regeneration control type DF Display format Dn n 1 to 7 Day of week DO Days override F...

Страница 49: ...tal order If none of the buttons are pushed for 5 minutes in the Programming mode or if there is a power failure the controller returns to Service mode without saving Mandatory In order to store the n...

Страница 50: ...ide DO 1 Press and simultaneously for 5 seconds to enter the menus sequence 2 Select the number of days of override with and 3 Press to validate the selection and advance to the next parameter 6 4 3 R...

Страница 51: ...ming some functions will not be displayed or will not be changeable 6 5 1 Master programming mode chart Parameter Options Definition Note DF Display format GAL US units Ltr Metric units VT Regeneratio...

Страница 52: ...reserve selection DO Days override 0 to 99 Day RT Regeneration time 00 00 00 to 23 59 59 Hour Regeneration time will not appear unless regeneration day override is on B1 First backwash 0 to 199 Minute...

Страница 53: ...ck K Meter pulse 0 1 to 999 9 Litre Only displayed for generic flow meter type 6 5 2 Entering master programming mode 1 Press and hold or until the programming icon replaces the service icon and the p...

Страница 54: ...hr other UFtr upflow filter for 5000 filter UFbd upflow brine first FLtr filter to be used with standard piston only except 5000 dF2b standard downflow double backwash 1 Press or to select t the regen...

Страница 55: ...00 valve being a double tanks system go back to number of tanks NT and set it to 2 Select which of the two tanks is in service 1 Press or to select which tank is in service 2 Press to validate the sel...

Страница 56: ...Installer manual Fleck 9000 SXT Programming 56 118 Ref MKT IM 020 C 21 11 2019 1 Press or to select the unit capacity 2 Press to validate the selection and to move the next parameter...

Страница 57: ...rdance with display format DF see Display format mode DF Page 54 2 Press to validate the selection and to move the next parameter 6 5 10 Reserve selection RS Info This parameter is not useful when reg...

Страница 58: ...f days that the system can stay in service mode without regeneration Mandatory In time clock mode this parameter must be set and the controller will need at least one regeneration day activated Settin...

Страница 59: ...can be set from 0 to 199 minutes 6 5 13 1 Regeneration abbreviations B1 First backwash BF Brine fill B2 Second backwash BW Backwash BD Brine draw RR Rapid rinse 6 5 13 2 For pre set regeneration cycl...

Страница 60: ...0 t0 7 turbine meter P1 0 1 paddle wheel meter Standard setting for 2750 and 9000 t1 0 1 turbine meter P1 5 1 paddle wheel meter Standard setting for 2850 t1 5 1 turbine meter P2 0 2 paddle wheel mete...

Страница 61: ...mode 6 6 Diagnostic 6 6 1 Peak flow rate PF Info The controller registers the highest flow rate L min since the last regeneration 1 Peak flow rate display 6 6 2 Commands Info If none of the buttons ar...

Страница 62: ...vice cycle 1 Hours since last regeneration display 6 6 5 Volume since last regeneration VU Info Shows the volume used since the last regeneration L 1 Volume since last regeneration display L or Gal de...

Страница 63: ...ere are two options to reset partial and hard reset Partial reset will set all the parameters to default values except volume remaining in volumetric systems and days since last regeneration in time c...

Страница 64: ...e SXT controller to the power source 7 Push on the regen button once to move the piston to the next regeneration cycle position Leave the valve 1 minute in each positions and move to the next one unti...

Страница 65: ...ic matter or in some cases with bacteria from the water supply This may result in an off taste or odour in the water Thus your softener may need to be disinfected after installation Some softeners wil...

Страница 66: ...for 1 L Brine tank softeners Backwash the softener and add the required amount of hypochlorite to the well of the brine tank The brine tank should have water in it to permit the chlorine solution to...

Страница 67: ...eration flow exhausted reserve immediate or delayed start in regeneration depending on the adjustment Tank in service Info In delayed volumetric mode the icon flashes as soon as the reserve begins to...

Страница 68: ...roduce chlorine compounds which may reduce the lifetime of the ion exchange resins Refer to the technical guides for resins in common use providing necessary checks on the system 8 3 Manual regenerati...

Страница 69: ...r failed Caution material Risk of damage due to power failure Without power the valve stays in its current position until power is restored The system should include all required safety components to...

Страница 70: ...truction 2 Inspection of electrical connections verify wiring connections and search for evidence of overloading 3 Verify settings of electronic timer verify regeneration frequency and make sure the v...

Страница 71: ...4 Test and record Total Hardness of outlet water from softener vessel s 9 1 3 2 Valve used for filtration 1 Initiate manual regeneration and observe flow to drain 2 Make sure flow rate correspond to D...

Страница 72: ...replace if necessary Replace O rings Check for watertightness clean or replace in case of leakage Check for watertightness clean or replace in case of leakage Check for watertightness clean or replac...

Страница 73: ...Check Check Check Valve to piping watertightness Check Check Check Check Check Wear parts durability strongly affected by raw water quality and regeneration frequency Electronic parts durability stro...

Страница 74: ...motors Refer to maintenance sheet 9 3 2 Use original approved lubricants Dow Corning 7 Release Agent 9 3 3 Maintenance instructions Disinfect and clean the system at least once a year or if the treat...

Страница 75: ...020 C 21 11 2019 75 118 9 4 2 Controller motor replacement 1 Loosen the wheels 1 and open the valve cover 2 2 Disconnect the motor 4 3 Unscrew 5 and pull out the old motor 4 and the plate 3 4 Change...

Страница 76: ...osen the wheels 1 and open the valve cover 2 2 Push the controller 3 3 Press the controller clips 5 and open the controller cover 4 4 Disconnect the old controller 7 and remove it opening the card cli...

Страница 77: ...ree the meter cable 5 and the controller 3 4 Using a 7 mm wrench or flat screwdriver unlock the pistons from the screws 6 5 Using a flat screwdriver remove 7 and free the upper piston plate 8 6 Using...

Страница 78: ...Installer manual Fleck 9000 SXT Maintenance 78 118 Ref MKT IM 020 C 21 11 2019...

Страница 79: ...cup 3 from the piston 4 4 Using a small hook remove a seal 5 5 Using the puller 1 remove a spacer 6 6 Repeat the two previous steps for all the seals and spacers 7 Lubricate all seals 5 with approved...

Страница 80: ...Installer manual Fleck 9000 SXT Maintenance 80 118 Ref MKT IM 020 C 21 11 2019...

Страница 81: ...ver cup 5 from the piston 6 5 Using a small hook remove a seal 7 6 Using the puller 1 remove a spacer 8 7 Repeat the two previous steps for all the seals and spacers 8 Lubricate all seals 7 with appro...

Страница 82: ...Installer manual Fleck 9000 SXT Maintenance 82 118 Ref MKT IM 020 C 21 11 2019...

Страница 83: ...000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 83 118 9 4 7 Back side seal and spacer cartridge replacement 9 4 7 1 Special tools needed 1 2 Item Part number Description Packaging quantity 1 13601 Pu...

Страница 84: ...driver unscrew 3 and remove the end cap 4 3 Remove the sub end plug 5 4 Using a small hook remove a seal 6 5 Using the puller 1 remove a spacer 7 6 Repeat the two previous steps for all the seals and...

Страница 85: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 85 118...

Страница 86: ...ased lubricant 1 Remove the lower piston see Lower piston and or front side seal and spacer kit replacement Page 81 2 Using a 8 mm wrench or flat screwdriver unscrew 3 and remove the end cap 4 PN BR42...

Страница 87: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 87 118...

Страница 88: ...he end cap 4 PN BR43458 3 Using a small hook remove a seal 6 4 Using the puller 1 remove a spacer 7 5 Repeat the two previous steps for all the seals and spacers 6 Lubricate all seals 6 with approved...

Страница 89: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 89 118...

Страница 90: ...IM 020 C 21 11 2019 9 4 8 Micro switches replacement 1 Loosen the wheels 1 and open the valve cover 2 2 Unscrew 4 and pull out the old micro switches 3 3 Disconnect the micro switches 3 4 Change the m...

Страница 91: ...limescale 7 Screw the injector 9 back 8 Screw the nozzle 8 back 9 Put the injector filter 10 back 10 Lubricate the o ring 7 with approved lubricant only Caution material Risk of damage due to wrong l...

Страница 92: ...Installer manual Fleck 9000 SXT Maintenance 92 118 Ref MKT IM 020 C 21 11 2019...

Страница 93: ...the BLFC 3 from the grid 4 4 Clean with a terry cloth or change the BLFC 3 and the seal 2 5 Clean the grid 4 6 Lubricate the seal 2 with approved lubricant only Caution material Risk of damage due to...

Страница 94: ...ded 3 Rotate the valve 1 clockwise and freely without using force until it comes to a stop Info This stop position is considered point zero 4 Rotate the valve 1 clockwise from point zero to between tu...

Страница 95: ...lean or replace injector and or filter Insufficient water flowing into brine tank Check brine tank filling time and clean flow regulator Hot water tank hardness Repeated flushing of the hot water tank...

Страница 96: ...he brine tank Plugged drain line flow control Clean drain line flow control Plugged injector system Clean injector and screen change if necessary Faulty brine valve Change brine valve Bad programming...

Страница 97: ...change cycle cam Drain flows continuously Foreign elements in the valve Clean valve and check it in the different regeneration positions Internal valve leak Change seals spacers and or piston assembl...

Страница 98: ...nals from microswitches 1 Unplug the unit and plug back in Allow the controller to attempt to find position again 2 Unplug the unit and examine the power head especially look at homing step microswitc...

Страница 99: ...plug the unit 9 Put it into bypass 10 Contact dealer 10 1 3 Regeneration failure Info The system has not regenerated for more than 99 days or 7 days if the controller type has been set to day of week...

Страница 100: ...1 2019 10 1 4 Memory error Info The controller board has a memory failure 1 Perform a master reset 2 Reconfigure the system via master programming mode 3 Step the valve through a manual regeneration 4...

Страница 101: ...rt number Description Packaging quantity 1 BU28523 01 VB assy 9000 DF 1 BU28523 02 VB assy 9000 DF HW 1 BU28523 03 VB assy 9000 UF 1 2 11335SP Piston rod screw 10 3 24234 US Piston assy 9000 9100 uppe...

Страница 102: ...valve produced from Nov 2009 until Apr 2015 1 BR43458 End cap for valve produced after Apr 2015 1 9 24874SP End plate screw for valve produced before Nov 2009 50 15331SP End cap screw for valve produ...

Страница 103: ...transformer 10VA 400 mA residential 1 4 15172SP Screw flat head 50 5 21271 Serial number label 1 6 18728SP Clip 9000 9500 50 7 BU28552 Transformer wire harness 1 8 13547SP Strain relief 24V 50 9 1936...

Страница 104: ...500 10 20 14896SP Wheel Geneva 10 21 15135SP Drive gear 9000 9100 9500 10 22 25870 Drive gear lower 9000 assy 1 23 15372SP Washer 9000 9500 10 24 15019 Link piston rod 1 25 23250SP Washer LN 4 50 26 1...

Страница 105: ...1 6 13296SP Screw 50 7 14265SP Clip spring timer 10 8 26983 Stand off 1 9 13881SP Timer hinge bracket 10 10 10300SP Timer screw 50 11 11384SP Screw PH 6 32x zinc 50 12 BU27808 Meter cable adapted SE...

Страница 106: ...em Part number Description Packaging quantity 1 BU26054 Bypass plastic 1 2 13314SP Screw slot ind hex 8 18 x 0 60 50 3 13255SP Clip mounting 12 4 13305 01SP O ring 10 5 18706 10 Yoke 1 BSP male plasti...

Страница 107: ...nual Fleck 9000 SXT Spare parts and options Ref MKT IM 020 C 21 11 2019 107 118 11 5 2 1 BSP female stainless steel bypass Item Part number Description Packaging quantity 1 BU28502 Bypass Stainless St...

Страница 108: ...ass handle red 10 4 15727 Screw Hex washer head 10 24 x 0 5 8 5 13604 01 Label bypass standard 1 6 BU11978 Cover bypass Top 1 7 BU11972 Plug bypass 1 8 14105SP Seal bypass 560CD 5 9 40634 10 Bypass bo...

Страница 109: ...Item Part number Description Packaging quantity 1 24734 10 Bypass 1 BSP female brass with mixing 1 2 BU28642 Screw TC slotted M6x30 10 3 24419 10SP Bypass handle red 10 4 11737SP Screw TH M5x12 8 5 2...

Страница 110: ...8 Distributor assy 1 high flow HW 1m10 24 21675 Distributor assy 1 high flow HW 1m88 12 2 27828 Distributor assy 1 UF high capacity 1 m 10 24 BU28509 Distributor assy 1 UF high capacity HW 1 m 10 24 2...

Страница 111: ...ounting clip 12 3 14202 01SP Screw adapt clip 9000 9100 50 4 13305 01SP O ring 560 CD adapt coupling 10 5 15078 01 Coupling assy 9000 4 6 12281 01SP O ring top of tank 560 CD 10 7 11710 01SP Adapt O r...

Страница 112: ...Brine system Part number Description Packaging quantity 1600 18168 Air checks 500A 915mm 36 48 26773 Air checks 500A 1m25 48 23473 Air checks 500 HW 48 11 9 Meters parts list 11 9 1 plastic turbine me...

Страница 113: ...30 Meter cover assy elec 1 4 13509SP Impeller meter except 2 3 10 5 24102 Meter body assy ring 1 6 13255SP Mounting clip 12 7 13314SP Screw adapt clip 50 14202 01SP Screw adapt clip 9000 9100 50 1 241...

Страница 114: ...ler meter except 2 3 10 5 15043 20 Meter body 1 9000 1 6 15078 01 Coupling assy 9000 4 7 13255SP Mounting clip 12 8 13314SP Screw adapt clip 50 14202 01SP Screw adapt clip 9000 9100 50 11 10 CE compli...

Страница 115: ...1 2 24735 Yoke 1 BSP female brass mixing 1 3 24689 Yoke BSP male brass 1 18706 12 Yoke BSP male plastic 1 18706 10 Yoke 1 BSP male plastic 1 11 12 Other components list Item Part number Description P...

Страница 116: ...Ref MKT IM 020 C 21 11 2019 Item Part number Description Packaging quantity 7 Kit 256 Adapter assembly kit coupling with o rings 1 8 13305 01SP O ring 560 CD adapt coupling 10 9 13255SP Mounting clip...

Страница 117: ...country of installation The components included in the system must be separated and recycled in a waste recycling center that conforms with the legislation in force in the country of installation Thi...

Страница 118: ...www pentairaquaeurope com...

Отзывы: