Installer Manual Fleck 4600 - MECH - Programming
Ref. MKT-IM-027 / B - 01.06.2018
49 / 88
6.3.2. Set the number of days between two regenerations
No.
Operation
A
Push the pins (
1
) out to set up.
Note
There are two time clock wheels:
•
7 days: based on the week, number 1 will refer to Monday, number 7 to Sunday;
•
12 days: allows to set a regular interval every 2, 3, 4 or 6 days.
Note
Example for the following drawing, the regeneration will occurs on Monday and Thursday.
Содержание Fleck 4600-MECH
Страница 1: ...FLECK 4600 MECH INSTALLER MANUAL WATER PURIFICATION ...
Страница 16: ...Installer Manual Fleck 4600 MECH Description 16 88 Ref MKT IM 027 B 01 06 2018 3 2 Outline drawing ...
Страница 59: ...Installer Manual Fleck 4600 MECH Maintenance Ref MKT IM 027 B 01 06 2018 59 88 ...
Страница 61: ...Installer Manual Fleck 4600 MECH Maintenance Ref MKT IM 027 B 01 06 2018 61 88 ...
Страница 74: ...Installer Manual Fleck 4600 MECH Spare parts 74 88 Ref MKT IM 027 B 01 06 2018 11 3 Valve parts list ...
Страница 76: ...Installer Manual Fleck 4600 MECH Spare parts 76 88 Ref MKT IM 027 B 01 06 2018 11 4 Meters parts list ...
Страница 87: ...Installer Manual Fleck 4600 MECH Disposal Ref MKT IM 027 B 01 06 2018 87 88 PAGE INTENTIONALLY LEFT BLANK ...
Страница 88: ...www pentairaquaeurope com ...