6.3. Time
clock
6.3.1. Calculating the number of days between two regenerations
Set the number of days between two regenerations using the following formulas:
Water capacity [m
3
] = (Exchange capacity [m
3
°tH] - Reserve capacity [m
3
]) / Water hardness [°tH]
Number of days between regenerations = Water capacity [m
3
] / Daily water consumption [m
3
]
1. 24 hour wheel
2. Program
wheel
→ Defines the number of days between two regenerations.
3. Time of day
→ Shows the current time.
4. Service
position
→ Service;
→ Regeneration;
→ Backwash;
→ Brine draw/slow rinse;
→ Brine refill.
5. Red
lamp
→ Lights when the valve regenerate.
6. Green
lamp
→ Lights when in service.
Содержание Fleck 4600-MECH
Страница 1: ...FLECK 4600 MECH INSTALLER MANUAL WATER PURIFICATION ...
Страница 16: ...Installer Manual Fleck 4600 MECH Description 16 88 Ref MKT IM 027 B 01 06 2018 3 2 Outline drawing ...
Страница 59: ...Installer Manual Fleck 4600 MECH Maintenance Ref MKT IM 027 B 01 06 2018 59 88 ...
Страница 61: ...Installer Manual Fleck 4600 MECH Maintenance Ref MKT IM 027 B 01 06 2018 61 88 ...
Страница 74: ...Installer Manual Fleck 4600 MECH Spare parts 74 88 Ref MKT IM 027 B 01 06 2018 11 3 Valve parts list ...
Страница 76: ...Installer Manual Fleck 4600 MECH Spare parts 76 88 Ref MKT IM 027 B 01 06 2018 11 4 Meters parts list ...
Страница 87: ...Installer Manual Fleck 4600 MECH Disposal Ref MKT IM 027 B 01 06 2018 87 88 PAGE INTENTIONALLY LEFT BLANK ...
Страница 88: ...www pentairaquaeurope com ...