Installer Manual Fleck 4600 - MECH - Installation
Ref. MKT-IM-027 / B - 01.06.2018
41 / 88
5.9. By-passing
A bypass valve system should be installed on all water conditioning systems. Bypass valves isolate the
softener from the water system and allow unconditioned water to be used. Service or routine
maintenance procedures may also require that the system is bypassed.
Caution
Do not solder pipes with lead-based solder.
Caution
Do not use tools to tighten plastic fittings. Over time, stress may break the connections.
Caution
Do not use petroleum grease on gaskets when connecting bypass plumbing. Use only 100%
silicone grease products when installing any plastic valve. Non-silicone grease may cause
plastic components to fail over time.
In Bypass
Out
Out
In
In
Softening System
Normal operation
Softening System
Содержание Fleck 4600-MECH
Страница 1: ...FLECK 4600 MECH INSTALLER MANUAL WATER PURIFICATION ...
Страница 16: ...Installer Manual Fleck 4600 MECH Description 16 88 Ref MKT IM 027 B 01 06 2018 3 2 Outline drawing ...
Страница 59: ...Installer Manual Fleck 4600 MECH Maintenance Ref MKT IM 027 B 01 06 2018 59 88 ...
Страница 61: ...Installer Manual Fleck 4600 MECH Maintenance Ref MKT IM 027 B 01 06 2018 61 88 ...
Страница 74: ...Installer Manual Fleck 4600 MECH Spare parts 74 88 Ref MKT IM 027 B 01 06 2018 11 3 Valve parts list ...
Страница 76: ...Installer Manual Fleck 4600 MECH Spare parts 76 88 Ref MKT IM 027 B 01 06 2018 11 4 Meters parts list ...
Страница 87: ...Installer Manual Fleck 4600 MECH Disposal Ref MKT IM 027 B 01 06 2018 87 88 PAGE INTENTIONALLY LEFT BLANK ...
Страница 88: ...www pentairaquaeurope com ...