Job Specification Sheet
.......................................................................................................................................... 3
Timer Operation
...................................................................................................................................................... 4
Master Programming Mode Flow Chart
............................................................................................................... 10
Master Programming Mode
.................................................................................................................................. 14
Operation Display Definitions & Examples
........................................................................................................... 20
Diagnostic Programming Mode Flow Chart
.......................................................................................................... 21
Diagnostic Programming Guide
........................................................................................................................... 22
Diagnostics Display Definitions & Examples
........................................................................................................ 24
Power Head Assembly 2750/2850/2900 Upper Drive and 2900 Lower Drive & Parts List
.................................. 26
Power Head Assembly 3150/3900 Upper Drive and 3900 Lower Drive & Parts List
...........................................
28
1” Brass Paddle Meter
.......................................................................................................................................... 30
1” & 1 1/2” Plastic Turbine Meter
.......................................................................................................................... 31
1 1/2” Brass Paddle Meter
.................................................................................................................................... 32
2” Brass Paddle Meter
.......................................................................................................................................... 33
2” Plastic Paddle Meter
........................................................................................................................................ 34
3” Brass Paddle Meter
..........................................................................................................................................
35
2750/2850 Timer Wiring Diagram
......................................................................................................................... 36
3150 Timer Wiring Diagram
..................................................................................................................................
37
2900 Timer Wiring Diagram
..................................................................................................................................
38
3900 Timer Wiring Diagram
..................................................................................................................................
39
3200NT Remote Timer Wiring Diagram
............................................................................................................... 40
2750/2850 - 3200NT Remote Wiring Diagram
..................................................................................................... 41
3150 - 3200NT Remote Wiring Diagram
.............................................................................................................. 42
2900 - 3200NT Remote Wiring Diagram
.............................................................................................................. 43
3900 - 3200NT Remote Wiring Diagram
.............................................................................................................. 44
Network Timer System Configuration Wiring Diagrams
.......................................................................................
45
Transformer, Phone Cable and Meter Cable Installation
...................................................................................... 46
Troubleshooting
....................................................................................................................................................
47
Table of Contents
IMPORTANT PLEASE READ:
The information, specifications and illustrations in this manual are based on the latest information available at the time of
printing. The manufacturer reserves the right to make changes at any time without notice.
This manual is intended as a guide for service of the valve only. System installation requires information from a number of
suppliers not known at the time of manufacture. This product should be installed by a plumbing professional.
This unit is designed to be installed on potable water systems only.
This product must be installed in compliance with all state and municipal plumbing and electrical codes. Permits may be
required at the time of installation.
If daytime operating pressure exceeds 80 psi, nighttime pressures may exceed pressure limits. A pressure reducing valve must
be installed.
Do not install the unit where temperatures may drop below 32°F (0°C) or above 125°F (52°C).
Do not place the unit in direct sunlight. Black units will absorb radiant heat increasing internal temperatures.
Do not strike the valve or any of the components.
Warranty of this product extends to manufacturing defects. Misapplication of this product may result in failure to properly
condition water, or damage to product.
A prefilter should be used on installations in which free solids are present.
In some applications local municipalities treat water with Chloramines. High Chloramine levels may damage valve components.
Correct and constant voltage must be supplied to the control valve to maintain proper function.
•
•
•
•
•
•
•
•
•
•
•
•
Содержание Fleck 3200NT
Страница 1: ...3200NT Service Manual IMPORTANT Fill in Pertinent Information on Page 3 for Future Reference...
Страница 25: ...Page 25 Notes...
Страница 26: ...Page 26 Power Head Assembly 2750 2850 2900 Upper Drive and 2900 Lower Drive...
Страница 28: ...Page 28 Power Head Assembly 3150 3900 Upper Drive and 3900 Lower Drive...
Страница 36: ...Page 36 2750 2850 Timer Wiring Diagram...
Страница 37: ...Page 37 3150 Timer Wiring Diagram...
Страница 38: ...Page 38 2900 Timer Wiring Diagram...
Страница 39: ...Page 39 3900 Timer Wiring Diagram...
Страница 40: ...Page 40 3200NT Remote Timer Wiring Diagram 42073_REVA...
Страница 41: ...Page 41 2750 2850 3200NT Remote Wiring Diagram 42074_REVA...
Страница 42: ...Page 42 3150 3200NT Remote Wiring Diagram 42076_REVA...
Страница 43: ...Page 43 2900 3200NT Remote Wiring Diagram 42075_REVA...
Страница 44: ...Page 44 3900 3200NT Remote Wiring Diagram 42077_REVA...
Страница 49: ...Page 49 Notes...
Страница 50: ...Page 50 Notes...
Страница 51: ...Page 51 Notes...
Страница 52: ...P N 41093 Rev E 9 06...