25 |
S t r o n a
It is forbidden to open boiler’s door during operation of burner.
Opening the door of the boiler is allowed only after extinguishing the burner and
disconnect of electric power.
Burner is designed for burning dry biomass, i.e. “pellets” in boilers operating in central
heating system.
Obligatorily burner must be electrically zeroed and connected to a socket with
zeroing pin 230V AC.
Electrical installation must be done accordingly to current safety rules and
regulations. Electrical installation powering a burner must be done in TN-S system and
protected by a RCD – residual current device 6A/30mA. For making an installation a
professional electrician must be responsible.
Installation of a burner must be executed by an authorized installer trained
by PELLAS X sp. z o.o. sp. k. (The Producer) and the Acceptance Report should
be written – which is included in User’s Manual.
Any sort of works and reparations of a burner or a feeder must be done with
disconnected powering cable from electricity.
The room in which a burner works must be well and constantly aired.
Exploitation can not be done in improper environmental conditions, i.e. too high
temperature, above 45ºC, in presence of aggressive compounds, dirt, bad
ventilation, etc.
Following items must be connected to the boiler: capillary safety sensor STB and boiler
temperature sensor outgoing from a burner.
Failure in observing by the user – owner of a burner the above SAFETY
REGULATIONS releases The Producer – PELLAS X sp. z o.o. sp. k. from any responsibility
for improper work of a burner and results in loss of the warranty.
If the user executes the installation of a burner not in accordance with
instructions and recommendations of the producer or when he does not have the
„Collection Report” written during first firing-up of a boiler by authorized installer
and confirmed with the signature of the user, then he or she loses the right to warranty
for burner faults. Also the guarantee is lost then.
6.4. Guarantee
Details in the GUARANTEE CARD attached to the User’s Manual.
Содержание HYBRID 44
Страница 1: ...1 S t r o n a...
Страница 2: ......
Страница 32: ...30 P a g e 10 REPORTS 10 1 First start up report Table 10 The pattern of the first start up...
Страница 33: ...31 S t r o n a 10 2 Inspection report Table 11 The pattern of first inspection report...
Страница 34: ...32 P a g e 11 LIST OF PICTURES AND TABLES...
Страница 36: ...34 P a g e NOTES...
Страница 37: ...35 S t r o n a NOTES...
Страница 38: ...36 P a g e...
Страница 39: ...37 S t r o n a...