background image

 

17 |

 

S t r o n a

 

 

Pic.6. Feeder’s auger installation. 

 

Fuel  dosing  is  done  automatically.  Feeder  operation  is  cyclic  and  is  operated  by  outer  controller. 
Feeder  should  be  positioned  at  maximum  45º  angle  in  relation  to  the  floor.  Flexible,  antistatic 
polyurethane  pipe  must  not  be  directed  vertically  above  the  pouring  chimney  of  burner,  but  at 
least 30 cm away from it. In case of pipe overheating (back burning) or its melting, pellet fuel will 
not be falling onto burner. Lack of fuel supply will cause burning off. It prevents against spreading 
fire on fuel hopper and on the rest of boiler room. 

NOTE:  Before  starting  the  burner,  fill  the  hopper  with  pellets  and  fill  the  feeder  until 
pellets will start falling into the burner. 

 

 

3.5.

 

STB protection 

 

In  case  when  oven    or    boiler  does  not    have  its    own    STB  protection,    a  thermostat    with    a 
capillary  on  clips  is  added  to  the  set.  Capillary  sensor  should  be  permanently  mounted  in  water 
coat of the boiler. After reaching critical (95

o

C) temperature of boiler, fuel feeder is cut off. In case 

of  restarting  the    burner  the    switcher  on    cover  should  be  reset,    before  that  the  cause  of 
switching off due to boiler overheating should be checked, assessed and right steps to solve the 
cause of the problem should be taken. 

 

3.6.

 

Boiler temperature sensor 

 

Burner  is  provided  together  with  boiler  temperature  sensor.    Its  task  is  to  control  firing  up  and 
burning off  process  in burner. 

It  does  not  refer  to  burner  version  destined for bakery 

ovens.

 

 

 
 
 

 
 
 
 

 
 

 
 

 
 

 
 

Содержание HYBRID 44

Страница 1: ...1 S t r o n a...

Страница 2: ......

Страница 3: ...1 Chimney 13 3 2 Boiler oven 13 3 3 Fuel hopper 15 3 4 External feeder 16 3 5 STB protection 17 3 6 Boiler temperature sensor 17 4 BURNER AND FEEDER ASSEMBLY 18 5 ADDITIONAL CONNECTIONS AND FIRST STA...

Страница 4: ...2 P a g e The author of this Manual is the company PELLAS X Sp z o o Sp k The use of part or all of this manual in other publications is possible only with the written permission of the author...

Страница 5: ...hould be protected against unfavorable environmental conditions snow rain dust and it should not be exposed to shocks hits and the packaging should be protected against damages Loading and unloading m...

Страница 6: ...at there are no visible damages and if delivery is complete and not damaged Possible reservations and problems should be reported to the supplier immediately He is responsible for insuring the merchan...

Страница 7: ...mental usability of the technology considerably better with the burner being one of the most modern solutions in the world The unique solutions employed in the HYBRID line burners include Hybrid Drive...

Страница 8: ...be connected Blowing system 5 located between the blowing assembly and the combustion chamber with a quick coupling in the upper part 6 to be attached to the feeding pipe by turning it clockwise detac...

Страница 9: ...ipe connecting the burner to the fuel feeder is attached The chimney is mounted to the rectangular opening in the upper part of the burner chamber A steel barrier with a counterbalance is installed in...

Страница 10: ...umidity 10 12 Humidity when delivered Not specified Not specified Caloric value MJ kg 18 1 17 5 HW 19 5 2 Sulphur 0 04 1 0 08 Nitrogen 0 3 1 0 3 Chlorine 0 02 1 0 03 Dust collected 2 3 Additives facil...

Страница 11: ...r voltage failure memory of recent settings Furnace made of highest quality heat resistant steel Modern controlling system Automatic operation firing up cleaning flame control Stepless electronical po...

Страница 12: ...to 96 to 96 to 99 Efficiency in boiler to 96 to 96 to 96 Power modulation YES YES YES Lambda probe YES optional YES optional YES optional CH pump service YES YES YES HUW pump service YES YES YES Mixe...

Страница 13: ...g holes for given types of burners There are 2 groups of burners from HYBRID line Group 1 HYBRID Mini HYBRID Mini 35 Group 2 HYBRID 44 Table 3 Dimensions of burners Type of burner Picture of mounting...

Страница 14: ...is founded on physical phenomenon which takes place in inner feeder of burner 3 Chimney for pouring fuel In upper part of the burner there is a chimney for pouring fuel It is equipped with a barring...

Страница 15: ...d too high or too low chimney have influence on efficiency of burner and its settings In such cases it is advised to install a stabilizer of chimney draft which will ventilate chimney and help in main...

Страница 16: ...ONS OF FURNACE CHAMBER MINIMUM LENGHT OF FURNACE CHAMBER mm HYBRID Mini 0 023 400 HYBRID Mini 35 0 030 520 HYBRID 44 0 038 520 Table 6 Exemplary minimum dimensions of rectangular furnace chamber TYPE...

Страница 17: ...ave any capacity and should be located in proper distance from burner Pic 7 In lower part of fuel hopper a spiral feeder in covering pipe is mounted The slope of feeder should not be bigger than 45 in...

Страница 18: ...is mounted in the lower part of the fuel hopper and its upper part is connected to the burner with the flexible polypropylene pipe Feeder assembly 1 Connect both pipes 1 and 2 with the bolt M8 3 and n...

Страница 19: ...per with pellets and fill the feeder until pellets will start falling into the burner 3 5 STB protection In case when oven or boiler does not have its own STB protection a thermostat with a capillary...

Страница 20: ...llation in boiler room Burner and feeder are delivered in ready made state ready for installing They are packed in cardboard boxes which have to be unpacked with care ATTENTION Before starting dismant...

Страница 21: ...isolate thermally the burner from the boiler door 2 isolation pad is not a part of the set Scheme of assembly HYBRID line burners in a boiler Insert the burner s furnace pipe in the boiler mounting ho...

Страница 22: ...der Pic 5 Attach with joint flexible pouring pipe long enough to connect with upper part of the feeder no less however than 30 cm from vertical pouring axis of burner Second part of flexible pipe inse...

Страница 23: ...of burner it can not be damaged and must be tightly screwed to the cover In case when oven or boiler does not have its own STB protection a capillary thermostat with fastener should be added to the s...

Страница 24: ...atically 6 EXPLOITATION AND SAFETY REGULATIONS 6 1 Exploitation Before starting up burner s operation all connections and joints with feeder should be checked Mounting screws which join burner with bo...

Страница 25: ...of furnace plate in HYBRID 44 burner Palniki HYBRID 44 wyposa one s w rur paleniskow umieszczon w rurze os onowej Aby dosta si do paleniska nale y powt rzy operacje 1 i 2 ze schematu monta u palnika...

Страница 26: ...sor Check of the firewall with counterweight condition if any Fumes analysis and chimney draught measuring Record of service counters status Cleaning of the blowing nozzles and burner furnace Check of...

Страница 27: ...of a burner or a feeder must be done with disconnected powering cable from electricity The room in which a burner works must be well and constantly aired Exploitation can not be done in improper envir...

Страница 28: ...activities the cover of a burner should be mounted Frequency of cleaning the photosensor Bakeries once a month Boiler rooms every 3 months Pic 12 Position of photosensor in HYBRID burners 7 2 Electri...

Страница 29: ...he feeder should be assembled and checked 7 4 Burner cleaning One of the reasons of lack of firing up of a burner may be a slag filling in the burner chamber The igniter will not ignite the fire when...

Страница 30: ...most common reason of this breakdown is damage of thermo protection of a sensor which results in overheating of measuring part Despite burner cooling off the fault can not be cancelled in this case t...

Страница 31: ...29 S t r o n a 9 ELECTRICAL SCHEMES Electrical scheme of Pellas X controller See controller s user s manual Electrical scheme of HYBRID burners Pic 13 Electrical scheme of HYBRID burners...

Страница 32: ...30 P a g e 10 REPORTS 10 1 First start up report Table 10 The pattern of the first start up...

Страница 33: ...31 S t r o n a 10 2 Inspection report Table 11 The pattern of first inspection report...

Страница 34: ...32 P a g e 11 LIST OF PICTURES AND TABLES...

Страница 35: ...ers 22 Pic 11 Correct positioning of furnace in burner HYBRID Mini and HYBRID Mini 35 23 Pic 12 Position of photosensor in HYBRID burners 26 Pic 13 Electrical scheme of HYBRID burners 29 List of table...

Страница 36: ...34 P a g e NOTES...

Страница 37: ...35 S t r o n a NOTES...

Страница 38: ...36 P a g e...

Страница 39: ...37 S t r o n a...

Отзывы: