30
6.
Service Switch
: The service switch interrupts the
power to the Infinite Energy boiler to allow service to
be performed.
7.
Convenience Outlet
: The convenience outlet is
provided for a condensate pump during operation. It
is not switched with the service switch to allow its use
during maintenance.
8.
Flame Sensor
: The flame sensor uses the principal of
flame rectification to sense the burner flame. This is
located on the right side of the heat exchanger front
plate. After ignition, the control also senses flame
through the ignition electrode.
9.
Gas Valve
: The gas valve is connected through a
special cord and connector. The connector is attached
to the valve with a screw.
10.
Ignition Electrode
: This electrode is located on the left
side of the heat exchanger front plate. A 10,000 volt
charge is initiated by the control to provide a spark for
lighting the burner. After the burner lights, and no
spark is present, the control uses this electrode as a
second source of flame detection.
11.
Combustion Air Fan
: The combustion air fan has two
connections. There is a 120 volt power connection (3-
wire) and a low voltage control connection (4-wire).
12.
Relay Module
: A relay module is provided that
isolates the pump terminals on the integrated primary
control. Current loads higher than the allowable 10
amps will require additional isolation relays.
Figure 7.2: Customer Connections for PFW-199, PFW-210 & PFW-399 Boilers
ELECTRICAL CONNECTIONS
The service switch does not disconnect power from
the convenience outlet.
WARNING
Содержание PUREFIRE PFW-199
Страница 20: ...18 WATER PIPING AND CONTROLS Figure 4 3 Schematic Piping One Boiler with a Single Storage Tank...
Страница 21: ...19 WATER PIPING AND CONTROLS Figure 4 4 Schematic Piping One Boiler with Multiple Storage Tanks...
Страница 22: ...20 Figure 4 5 Schematic Piping Two Boilers with a Single Storage Tank WATER PIPING AND CONTROLS...
Страница 23: ...21 WATER PIPING AND CONTROLS Figure 4 6 Schematic Piping Two Boilers with Multiple Storage Tanks...
Страница 24: ...22 WATER PIPING AND CONTROLS Figure 4 7 Schematic Piping Alternate Piping with Patented Anti Scale System...
Страница 33: ...31 Figure 7 3 Internal Wiring Schematic for PFW 199 PFW 210 PFW 399 Boilers ELECTRICAL CONNECTIONS...
Страница 47: ...E LIGHTING OPERATING PROCEDURES 45 Figure 9 4 Lighting Operating Instructions START UP PROCEDURE...
Страница 60: ...58 Figure 13 2 Heat Exchanger Burner Assembly Repair Parts REPAIR PARTS...
Страница 63: ...61 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS...
Страница 64: ...62 APPENDIX A STATUS SCREENS...
Страница 65: ...63 APPENDIX A STATUS SCREENS...
Страница 66: ...64 APPENDIX B USER MENU APPENDIX B USER MENU...
Страница 67: ...65 APPENDIX B USER MENU...
Страница 68: ...66 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU...
Страница 69: ...67 APPENDIX C INSTALLER MENU...
Страница 70: ...68 APPENDIX C INSTALLER MENU...
Страница 71: ...69 APPENDIX C INSTALLER MENU...