24
FUEL PIPING
A. GENERAL
1. All fuel piping to the PureFire boiler is to be in
accordance with local codes. In the absence of local
regulations refer to the
National Fuel Gas Code, ANSI
Z223.1/NFPA 54
.
2. Size and install fuel piping to provide a supply of gas
sufficient to meet the maximum demand of all
appliances supplied by the piping.
B. FUEL LINE SIZING
1. The required flow rate of gas fuel to the boiler can be
determined by the following.
The gas heating value can be supplied by the gas supplier.
2. As an alternative, use Table 5.1 to determine the
required gas flow rate which uses typical heating values
for natural gas and liquefied petroleum (LP) gas.
3. Table 5.2 shows the maximum flow capacity of
several pipe sizes based on 0.3" of pressure drop.
a. The values shown are based on a gas specific
gravity of 0.60 (Typical for natural gas).
b. Multiply the capacities listed by the correction
factors listed for gas with a specific gravity other
than 0.60 to obtain the corrected capacity.
4. Size and install the fuel gas supply piping for no more
than 0.5 inches of water pressure drop between the
gas regulator and the boiler.
C. GAS SUPPLY PIPING - INSTALLATION
1. Do not install any piping directly in front of the boiler
or along either side. Always provide access to the
front cover and side panel openings.
2. Install a sediment trap as shown in Figure 5.1. Be sure
to allow clearance from the floor or other horizontal
surface for removal of the pipe cap.
3. Install a ground joint union between the sediment trap
and the boiler to allow service to the appliance.
4. Install a service valve as shown in Figure 5.1 to allow
the gas supply to be interrupted for service.
5. Maintain a minimum distance of 10 feet (3048 mm)
between the gas pressure regulator and the boiler.
5. FUEL PIPING
Use a pipe joint sealing compound that is resistant to
liquefied petroleum gas. A non-resistant compound
may lose sealing ability in the presence of this gas,
resulting in a gas leak. Gas leaks may potentially
cause an explosion or fire.
WARNING
Pipe
Length
ft (m)
1/2" NPT
Pipe
3/4" NPT
Pipe
1" NPT
Pipe
1-1/4"
NPT
Pipe
1-1/2"
NPT
Pipe
10
(3.0)
132
(3.7)
278
(7.9)
520
(14.7)
1,050
(29.7)
1,600
(45.3)
20
(6.1)
92
(2.6)
190
(5.4)
350
(9.9)
730
(20.7)
1,100
(31.1)
30
(9.1)
73
(2.1)
152
(4.3)
285
(8.1)
590
(16.7)
890
(25.2)
40
(12.2)
63
(1.8)
130
(3.7)
245
(6.9)
500
(14.2)
760
(21.5)
50
(15.2)
56
(1.6)
115
(3.3)
215
(6.1)
440
(12.5)
670
(19.0)
60
(18.3)
50
(1.4)
105
(3.0)
195
(5.5)
400
(11.3)
610
(17.3)
70
(21.3)
46
(1.3)
96
(2.7)
180
(5.1)
370
(10.5)
560
(15.9)
80
(24.4)
43
(1.2)
90
(2.5)
170
(4.8)
350
(9.9)
530
(15.0)
90
(27.4)
40
(1.1)
84
(2.4)
160
(4.5)
320
(9.1)
490
(13.9)
100
(30.5)
38
(1.1)
79
(2.2)
150
(4.2)
305
(8.6)
460
(13.0)
The values are based on a specific gravity of 0.60 (typical for
natural gas). See Table 4.3 for capacity correction factors for
gases with other specific gravities.
Specific Gravity
0.50
0.55
0.60
0.65
0.70
0.75
Correction Factor
1.10
1.04
1.00
0.96
0.93
0.90
Specific Gravity
0.80
0.85
0.90
1.00
1.10
1.20
Correction Factor
0.87
0.84
0.82
0.78
0.74
0.71
Specific Gravity
1.30
1.40
1.50
1.60
1.70
1.80
Correction Factor
0.68
0.66
0.63
0.61
0.59
0.58
Table 5.2: Pipe Capacity:
Maximum Capacity of pipe in cubic feet per hour (cubic meters
per hour) with a pressure drop of 0.3" of water (75 Pa).
Boiler Input Rate
Gas Heating Value
Input Rate
(
ft³
/
hr
)
=
(
Btu
/
hr
)
(
Btu
/
ft³
)
Table 5.1: Required Fuel Input
PureFire
Model
Required Input Rate*
Natural Gas
ft
3
/hr (m
3
/hr)
LP Gas
ft
3
/hr (m
3
/hr)
PFW-199
199 (5.6)
80 (2.3)
PFW-210
210 (5.9)
84 (2.4)
PFW-399
399 (11.3)
160 (4.5)
* Natural gas input rates are based on 1,000 Btu/ft
3
, LP input
rates are based on 2,500 Btu/ft
3
.
Содержание PUREFIRE PFW-199
Страница 20: ...18 WATER PIPING AND CONTROLS Figure 4 3 Schematic Piping One Boiler with a Single Storage Tank...
Страница 21: ...19 WATER PIPING AND CONTROLS Figure 4 4 Schematic Piping One Boiler with Multiple Storage Tanks...
Страница 22: ...20 Figure 4 5 Schematic Piping Two Boilers with a Single Storage Tank WATER PIPING AND CONTROLS...
Страница 23: ...21 WATER PIPING AND CONTROLS Figure 4 6 Schematic Piping Two Boilers with Multiple Storage Tanks...
Страница 24: ...22 WATER PIPING AND CONTROLS Figure 4 7 Schematic Piping Alternate Piping with Patented Anti Scale System...
Страница 33: ...31 Figure 7 3 Internal Wiring Schematic for PFW 199 PFW 210 PFW 399 Boilers ELECTRICAL CONNECTIONS...
Страница 47: ...E LIGHTING OPERATING PROCEDURES 45 Figure 9 4 Lighting Operating Instructions START UP PROCEDURE...
Страница 60: ...58 Figure 13 2 Heat Exchanger Burner Assembly Repair Parts REPAIR PARTS...
Страница 63: ...61 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS...
Страница 64: ...62 APPENDIX A STATUS SCREENS...
Страница 65: ...63 APPENDIX A STATUS SCREENS...
Страница 66: ...64 APPENDIX B USER MENU APPENDIX B USER MENU...
Страница 67: ...65 APPENDIX B USER MENU...
Страница 68: ...66 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU...
Страница 69: ...67 APPENDIX C INSTALLER MENU...
Страница 70: ...68 APPENDIX C INSTALLER MENU...
Страница 71: ...69 APPENDIX C INSTALLER MENU...