
27
A. GENERAL
1. The disposal of all condensate into public sewage
systems is to be in accordance with local codes and
regulations. In the absence of such codes, follow these
instructions.
2. Proper piping and removal of condensation from
combustion is critical to the operation of a condensing
appliance. Follow these instructions carefully to assure
that your Infinite Energy boiler operates correctly.
3. Depending on several factors, the condensate from
gas fired condensing appliances may have a pH value
as low as 2.5 (similar to cola soft drinks). Some local
codes require the use of neutralization equipment to
treat acidic condensate.
B. CONDENSATE SYSTEM
The PureFire condensate system is designed to prevent
condensate from backing up into the heat exchanger, trap
the condensate to prevent combustion gases from
escaping and neutralize acidic condensate. Refer to Figure
6.1 for an illustration of the system components.
1.
Condensate Drain Hoses
: The PFW-199, PFW-210
and PFW-399 boilers have two drain hoses attached
to the heat exchanger. The first hose drains
condensate from the combustion chamber of the
boiler. The second hose drains condensate from the
vent system. This prevents dirt and debris from the
venting system from entering the heat exchanger and
fouling the heating surface.
PFW-199, PFW-210 and PFW-399 boilers have only
one drain attached directly to the combustion
chamber. To prevent debris from entering the heat
exchanger, a separate drain can be added to the vent
system as shown in Figure 6.2. However, be sure to
adequately trap any vent system drains.
2.
Condensate Collector Container
: The condensate
collector container is a transparent container in the
base of the boiler near the back. This container
collects the condensate and acts as a part of a trap to
prevent combustion gases from escaping. The
container is fitted with a level switch that will prevent
the boiler from operating if the condensate line is
clogged.
3.
Condensate Float Switch
: This switch will prevent the
boiler from operating if the condensate outlet is
clogged before the level of condensate reaches the
heat exchanger.
6. CONDENSATE DRAIN PIPING
Figure 6.1: Condensate Trap System
Figure 6.2: Separate Vent Condensate Drain
Installation
CONDENSATE DRAIN PIPING
Содержание PUREFIRE PFW-199
Страница 20: ...18 WATER PIPING AND CONTROLS Figure 4 3 Schematic Piping One Boiler with a Single Storage Tank...
Страница 21: ...19 WATER PIPING AND CONTROLS Figure 4 4 Schematic Piping One Boiler with Multiple Storage Tanks...
Страница 22: ...20 Figure 4 5 Schematic Piping Two Boilers with a Single Storage Tank WATER PIPING AND CONTROLS...
Страница 23: ...21 WATER PIPING AND CONTROLS Figure 4 6 Schematic Piping Two Boilers with Multiple Storage Tanks...
Страница 24: ...22 WATER PIPING AND CONTROLS Figure 4 7 Schematic Piping Alternate Piping with Patented Anti Scale System...
Страница 33: ...31 Figure 7 3 Internal Wiring Schematic for PFW 199 PFW 210 PFW 399 Boilers ELECTRICAL CONNECTIONS...
Страница 47: ...E LIGHTING OPERATING PROCEDURES 45 Figure 9 4 Lighting Operating Instructions START UP PROCEDURE...
Страница 60: ...58 Figure 13 2 Heat Exchanger Burner Assembly Repair Parts REPAIR PARTS...
Страница 63: ...61 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS...
Страница 64: ...62 APPENDIX A STATUS SCREENS...
Страница 65: ...63 APPENDIX A STATUS SCREENS...
Страница 66: ...64 APPENDIX B USER MENU APPENDIX B USER MENU...
Страница 67: ...65 APPENDIX B USER MENU...
Страница 68: ...66 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU...
Страница 69: ...67 APPENDIX C INSTALLER MENU...
Страница 70: ...68 APPENDIX C INSTALLER MENU...
Страница 71: ...69 APPENDIX C INSTALLER MENU...