background image

1

User Manual

UM – N*10DR – Rev 4

Nitrogen N*10DR Nitrogen Generator

Содержание N 10DR Series

Страница 1: ...1 User Manual UM N 10DR Rev 4 Nitrogen N 10DR Nitrogen Generator...

Страница 2: ...duction 7 Unpacking and Installation 8 Removal of Transit Bracket 9 Useful Information 10 Electrical Connection 10 Generator Environment 11 General Dimensions 11 Generator Connections 12 Generator Con...

Страница 3: ...elease G L 16 10 06 2 Notes added for Indoor use only Altitude T G 10 09 07 3 Update USA address S K 25 08 2008 4 Updated solenoid valve part S K 26 01 2009 Document Change History Nitrogen N 10DR Nit...

Страница 4: ...5 Subject to the Company being notified of any defect as is referred to in sub clause 2 hereof within a reasonable time of it becoming apparent and subject always to the terms of sub clause 4 hereof...

Страница 5: ...5 Declaration of Conformity Nitrogen N 10DR Nitrogen Generator UM N 10DR Rev 4...

Страница 6: ...0 01 m Outlet 1 4 BSP 1 Pressure Gauges 1 Pthalates None Suspended Liquids None Electrical Requirements 230V 50 60 Hz 8 4 amps Compressor fuse on Control PCB 8 0 amps PLC fan fuse on Control PCB 2 0 a...

Страница 7: ...uble free Nitrogen generation Please review each of the following sections carefully and ensure that the maintenance log at the rear of this manual is updated for future reference Thank you for select...

Страница 8: ...to unpacking Unpacking and Installation ANY DAMAGE SHOULD BE REPORTED IMMEDIATELY TO THE CARRIER AND PEAK SCIENTIFIC OR THE DISTRIBUTOR FROM WHERE THE UNIT WAS PURCHASED Follow the un packing instruct...

Страница 9: ...et to the Compressors Remove Screws 6 7 holding the Bracket to the internal side panels Remove transit bracket from unit Re fit the rear panel in reverse order of removal Important Note The Transit Br...

Страница 10: ...ab i e for the first 10 meters use 6 4 tubing and the final 20 meters use 10 8 Keep the connections and bends to a minimum The imperial equivalents are 6 4 1 4 O D 3 16 I D 10 8 3 8 O D 5 16 I D Elect...

Страница 11: ...imity of Air Conditioning outlets These can sometimes give rise to pockets of air with high relative humidity Operation of the unit within such a pocket could adversely affect its performance Consider...

Страница 12: ...nt panel lock Pressure Gauge Service light Connections Nitrogen N 10DR Nitrogen Generator UM N 10DR Rev 4 Power Cord 230V ONLY 04 1038 EU 04 1029 US 04 1030 UK Rear panel lock 9 way D type connector f...

Страница 13: ...The system will now run through an automatic compressor check procedure Each of the four compressors is tested in turn to ensure that it is working The compressor check takes a minute or so and then...

Страница 14: ...0 days MENU Software Rev V1 55 System Hours Diagnostic To display the current status of each compressor the system and the inlet filter The compressors are numbered 1 to 4 from the right hand side loo...

Страница 15: ...oller Rotate knurled locking nut at base of adjustment knob to release lock Rotate to increase decrease flow Rotate knurled locking nut at base of adjustment knob to lock Unusual Operation If at any t...

Страница 16: ...minutes for unit to fully de pressurise After this time pull out the Quick Release Ring on the Pressure Relief valve situated on the tank Ensure tank is fully depressurised before releasing the ring S...

Страница 17: ...17 Work Done Remarks Name Date Maintenance Log for Serial Number _____________ Maintenance Log Nitrogen N 10DR Nitrogen Generator UM N 10DR Rev 4...

Отзывы: