8
Although Peak Scientific takes every precaution with safe transit and packaging, it is
advisable to fully inspect the unit for any sign of transit damage.
Check ‘SHOCKWATCH’ label for signs of rough handling prior to unpacking -
Unpacking and Installation
ANY DAMAGE SHOULD BE REPORTED IMMEDIATELY TO THE CARRIER AND
PEAK SCIENTIFIC OR THE DISTRIBUTOR FROM WHERE THE UNIT WAS
PURCHASED.
Follow the un-packing instructions posted on the side of the crate. It will require two
people to lift the crate clear and to manoeuvre the generator onto the floor.
Unpacking and
Installation
Nitrogen N*10DR Nitrogen Generator
UM – N*10DR – Rev 4