![Paul NOVUS 300 Скачать руководство пользователя страница 66](http://html2.mh-extra.com/html/paul/novus-300/novus-300_original-operating-instructions_4024729066.webp)
Date: 03/02/14
Subject to change
in the interest of technical
progress.
Commissioning and handover
certificate
Completeness and performance
verifications acc. to DIN 1946-6
© PAUL Wärmerückgewinnung GmbH • August-Horch-Straße 7 • 08141 Reinsdorf • Germany
Tel: +49(0)375-303505-0 • Fax: +49(0)375-303505-55 • E-Mail: [email protected] • Internet: www.paul-lueftung.de
Customer data
Surname: Surname: Surname:
Street: Street: Street:
Construction project:
MVHR-type: MVHR-type: MVHR-type:
Completeness
No.
Device
Ausführung
Result
1
Supply air duct
- Version as planned
- Cleaning possible
yes / no
yes / no
2
Supply air outlets
- Configuration as planned
- Version as planned
- Cleaning possible
-
sufficient distance from the wall
yes / no
yes / no
yes / no
yes / no
3 Overflow
air
outlets
- Configuration as planned
- Version as planned
yes / no
yes / no
4
Extract air outlets
- Configuration as planned
- Version as planned
- Cleaning possible
-
Pre-filter provided as planned?
yes / no
yes / no
yes / no
yes / no
5
Extract air duct
- Cleaning possible
yes / no
6
Extract air fan
- Cleaning possible
yes / no
7
Control unit
- working?
yes / no
8 Filters,
optional
- Possibility to change
- or clean
yes / no
9
Heat exchanger for heat recovery
- Cleaning possible
yes / no
10
Extract air heat pump, optional
- Cleaning possible
yes / no
11
Condensate drain, optional
- working?
yes / no
12
Ground to air heat exchanger,
optional
- Cleaning possible
yes / no
13
Duct heater, optional
- Cleaning possible
yes / no
14
Solar panel
- Cleaning possible
yes / no
15
Documentation / manual
- available
yes / no
Function
1
Ready to use in standard mode
(nominal ventilation), as planned
Result OK
further steps necessary
yes / no
yes / no
2
Different modes possible, as
planned
Result OK
further steps necessary
yes / no
yes / no
3 Power
consumption
Result OK
further steps necessary
yes / no
yes / no
Confirmation
Date: ................................... Signature/Stamp:.......................................................................................
Startup personnel / Plumber
Содержание NOVUS 300
Страница 1: ...Version 2 0_10 2014 EN...
Страница 59: ...59 Dimensional sketch 3 9 5 Fig 47 Dimension drawing HRU NOVUS...
Страница 60: ...60 Plant 1 circuit diagram NOVUS 3 9 6...
Страница 61: ...61 Plant 2 circuit diagram NOVUS with integrated defroster 3 9 7...
Страница 62: ...62 Plant 3 Terminal scheme of through terminal X10 3 9 8...