![Paul NOVUS 300 Скачать руководство пользователя страница 64](http://html2.mh-extra.com/html/paul/novus-300/novus-300_original-operating-instructions_4024729064.webp)
Date: 13/10/14
Subject to change
in the interest of technical
progress.
Checklist B
Maintenance by skilled personnel
© PAUL Wärmerückgewinnung GmbH • August-Horch-Straße 7 • 08141 Reinsdorf • Germany
Tel: +49(0)375-303505-0 • Fax: +49(0)375-303505-55 • E-Mail: [email protected] • Internet: www.paul-lueftung.de
Maintenance
Enter result
−
Inspection of MVHR unit based according to the currently valid national standards
−
Informal report for comments on MVHR unit's condition
−
Use additional sheet of paper for adding reports of subsequent years
No.
Components
Action / Interval
(yearly)
Result
201...
201...
201...
201...
201...
1
Fan / MVHR unit
Components cleaned?
- fans
- Heat exchanger
- air-contacting surfaces of the device
- preheater
- condensate pan, siphon,
yes / no
Frost protection device functional?
yes / no
Structure-borne-noise transmission,
fixings are avoided?
yes / no
Preheater / vaporizer / heat exchanger
are not contaminated?
yes / no
Status indicators are working?
yes / no
2
Condensate drain
and siphon
Working?
yes / no
Condensate disposal OK?
yes / no
3 Electronic
controls
Cable connections and clamp fixing
secure?
yes / no
Control units working?
yes / no
4
Air ducts / heat insu-
lation
Cleaning done (if required)? Test OK?
yes / no
Heat insulation and vapor barrier diffu-
sion-close OK?
yes / no
Flexible connections between MVHR
and air ducts OK?
yes / no
5
Ground to air heat
exchanger (if availa-
ble)
Changeover working?
yes / no
Outdoor air intake free?
yes / no
Condition of prefilter OK?
yes / no
Condensate drain OK?
yes / no
Cleaning of the GHE (rinsing)
yes / no
6
Fan / MVHR unit and
fireplace operating
mode (if available)
Safety device with firing installation
working?
yes / no
7
Fan / MVHR unit /
other filters, filter
condition
Filters of correct filter class installed?
yes / no
8
Extract air / supply
air outlet
Overflow air ducts
Fit and lock OK?
yes / no
Filter condition OK?
yes / no
Air flow according air flow report OK?
yes / no
Free cross-section?
yes / no
9 Overflow
air
ducts
No structure-borne / airborne noise
transmission?
yes / no
Safety device with firing installation
working?
yes / no
Содержание NOVUS 300
Страница 1: ...Version 2 0_10 2014 EN...
Страница 59: ...59 Dimensional sketch 3 9 5 Fig 47 Dimension drawing HRU NOVUS...
Страница 60: ...60 Plant 1 circuit diagram NOVUS 3 9 6...
Страница 61: ...61 Plant 2 circuit diagram NOVUS with integrated defroster 3 9 7...
Страница 62: ...62 Plant 3 Terminal scheme of through terminal X10 3 9 8...