DETAIL A
Parts List
DESCRIPTION
PART NUMBER
QTY
ITEM
Formed Paddle
CS-P020
3
1
Hex Bolt
B3/8x3/4
12
2
Nylock Nut
N3/8NYL
12
3
15" Paddle
P134
3
4
19" Paddle
P119
3
4.1
Narrow paddle for 20" and 22" Rows
P125
3
4.2
27" Paddle
P130
3
4.3
Narrow 15" Paddle
P135
3
4.4
Hex Button Head Screw 15" Paddles
B1/4x.75
9
5
Hex Button Head Screw Aggressive Paddles
B1/4x1.25
9
5.5
Nylock Nut
N1/4NYL
9
6
1/4 x 3/4 Zip Screw
SC1/4x.75SelfDrill
3
7
A
Minden Machine Shop Inc.
1302 K Road Minden, NE
800-264-6587 / 308-832-0220
4
1
5
6
3
2
Mounting Paddles to the Front Tube
1.
Attach the plastic paddles (Item 4 - 4.4 depending upon style) to the steel
frame (Item 1) using hex button cap screw (Item 5 or 5.5) and the nuts (Item
6).
2.
Assemble two paddles (Item 1 and 4 assembled) using the 3/8" bolts and nuts
(Item 2 and 3). Do not tighten completely.
3.
Fit the paddle assembly over the front tube near its intended location on the
tube. Add the third paddle with the 3/8" bolts and nuts. Tighten the bolts
lightly. This is called a paddle set. Repeat for each row of the crop sweeper.
4.
Slide the paddle sets to the center of each of their associated rows directly
above the center of the gathering chains.
5.
The paddle sets will need to be timed. Begin on the right side and tighten the
paddle set in place with the 3/8" bolts and nuts.
6.
The next paddle set will be set 60 degrees from the first (basically the paddles
will be half way between the first paddle set.
7.
The third paddle set will align with the first paddle set.
8.
The fourth paddle set will align with the second paddle set.
9.
Repeat this pattern until all paddle sets are timed and tightened in place. Refer
to the Machine Layout Guide for illustration.
10. Drill through the paddle ear hole into the main tube with a 3/32" drill bit and
install the zip screw (Item 7). Repeat, 3 screws per paddle set. Be careful not
to over tighten. Repeat for all paddle sets.
Paddle Ear Hole
Facing front of
corn head when
mounted
Crop Sweeper V 10.0
44