2.1.  Minimum Space Requirements 

 

Installation 

W × W × D 

Digital MDM® mixer head (small bezel) 

4-

1/4” × 9-3/4” × 6-1/2” 

Digital MDM® mixer head (large bezel) 

4-

1/4” × 12-5/8” × 6-1/2” 

Digital MDM® mixer head (large bezel with outlet) 

4-

1/4” × 12-5/8” × 6-1/2” 

Bag tee/scavenger system (flush mount) 

18” × 3-1/2” × 4-1/4” * 

Bag tee/scavenger system (mounted inside the cabinet on swing arm) 

18” × 3-1/2” × 8-1/2” * 

* Includes reservoir breathing bag 

 

 

 

Section 3    Safety Checks 

 

3.1 

Final Connection Checklist 

When all items have been installed, all hose connections 
must be checked and tested. 
 
The installer must ensure that all gas connections are 
correctly made and leak free. The installation must conform 
to NFPA 99C guidelines, as well as all local codes and 
ordinances. For proper United States color coding, see 
page 2. 
 

WARNING 

Route all hoses and cords so that there are no 
obstructions, pinched or kinked hoses, or potential 
abrasions of hoses and cords when the installations 
complete. 

 

NOTE 

When all connections are complete, all gas stop valves 
and hoses must be accessible for future maintenance 
of the mixer and its components.  

 

3.2 

Cross Pipeline Tests 

 

WARNING 

Although this analgesia machine is designed to restrict 
the interchanging of the two gases, it is the 
responsibility of both the user and the installer to 
determine that only oxygen flows into the oxygen fitting 
and that only nitrous oxide flows into the nitrous oxide 
fitting located at the rear of the mixer head. 
 
If the gas pipeline test fails at any step, the pipeline 
must be repaired and tested again, starting at step 1. 
Before repair or testing, the entire system must be 
purged of any residual gas. If repair is required, follow 
the NFPA 99C code for brazing requirements; see the 
Introduction. 

 
 

 
 

 

1.  Close the gas shutoff valves on the main supply 

cylinders. 

 
2.  Exhaust the gas from the entire manifold and pipeline 

system by sequentially connecting an indexed gas hose 
to each outlet station or connection point. 

 

WARNING 

To prevent injury from hose whip, always hold the free 
end of the hose. 

 
3.  Open the oxygen shutoff valve on the main cylinder 

only. 

 
4.  Verify: 
 

  that oxygen gas flows at each oxygen outlet station 

 

  that no gas flows at each nitrous oxide outlet station 

 

NOTE 

Use only oxygen or nitrous oxide when testing gas 
lines. 

 
5.  With the oxygen still pressurized, open the nitrous oxide 

shutoff valve on the main cylinder. 

 
6.  Verify that nitrous oxide gas flows at each nitrous oxide 

outlet station 

 

3.3 

Gas Outlet Station Tests 

If additional gas outlet stations are installed, complete the 
test procedures listed in the Matrx by Parker Outlet Stations 
Installation and Parts Manual. 
 

3.4 

Mixer Tests 

Complete the performance checks listed in section 3.1 of 
the Digital MDM® Operations Manual (Part No. 10545100).

Содержание Matrx Digital MDM

Страница 1: ...Ref 10550800 Rev F Parker Hannifin Corporation Porter Instrument 245 Township Line Road Hatfield PA 19440 USA Tel 215 723 4000...

Страница 2: ...g addresses Porter Regulatory Affairs EU Authorized Representative Parker Hannifin Corporation Parker Hannifin Ltd Porter Instrument Instrumentation Products Division 245 Township Line Road Riverside...

Страница 3: ...ility A licensed electrical person should be consulted to confirm the Protective Earth ground connection Do not use an electrical cord with nicks cuts or other damage Do not use the unit with an exten...

Страница 4: ...enging Control Valve Installation 6 1 6 J Hook Installation 8 1 7 Hose Connection 8 1 8 Rubber Goods Installation 9 1 9 Installation of Power Cord and Protective Earth ground Connection 10 Section 2 S...

Страница 5: ...ns 5 Figure 4 Screw and Tee Nut Adjustment 5 Figure 5 Digital MDM Mixer Head Installation 6 Figure 6 Flush Mounting the Bag Tee and Scavenging Control Valve 6 Figure 7 Surface Mounting the Bag Tee and...

Страница 6: ...tact Information Unit Serial Number Date Purchased Dealer Name Dealer Phone Number Notes Contact Information Parker Hannifin Corporation Porter Instrument 245 Township Line Road Hatfield PA 19440 USA...

Страница 7: ...he fittings and tubing incorporate unique tubing sizes for each gas an important safety feature to prevent accidental crossing of lines during installation or maintenance The following basic requireme...

Страница 8: ...information on the NFPA 99C code requirements consult your local Matrx by Parker representative or your local dental dealer U S Gas Color Coding All products in this manual are manufactured according...

Страница 9: ...A guideline No 99C see the Introduction for details All equipment must be installed in accordance with these guidelines as well as all local codes and ordinances Matrx by Parker makes no warranty for...

Страница 10: ...tion 1 Install the necessary gas plumbing from the central gas supply 2 If separate gas outlet stations are to be installed install the necessary gas plumbing See the Outlet Stations Installation and...

Страница 11: ...4 mounting holes See Figure 4 6 While supporting the front of the cabinet tap in the tee nuts with a hammer Alternately a C clamp can be used to squeeze the tee nuts into the cabinet surface Be certa...

Страница 12: ...installed The attachment to the cabinet surface must be sufficiently rigid to withstand the stress The bag tee scavenging control valve assembly may be installed on plywood attached to studs or on a...

Страница 13: ...hammer Alternately a C clamp can be used to squeeze the tee nuts into the cabinet surface Be certain to protect the front surface of the cabinet with a clean piece of wood between the C clamp and the...

Страница 14: ...ace steps 8 9 and then installing the bag tee scavenging control valve to the mounting bracket steps 4 7 1 6 J Hook Installation The Digital MDM Flush Cabinet Mount Installation Kit includes a J hook...

Страница 15: ...9 Figure 9 Connections Schematic some components may not be part of your installation Figure 10 Installation of Rubber Goods 1 8 Rubber Goods Installation Install the rubber goods See Figure 10...

Страница 16: ...cord at the rear of the mixer head See Figure 11 Connect the power cord to the electrical outlet WARNING For safety a Protective Earth ground connection must be made through power cord 3rd wire or Gro...

Страница 17: ...d the installer to determine that only oxygen flows into the oxygen fitting and that only nitrous oxide flows into the nitrous oxide fitting located at the rear of the mixer head If the gas pipeline t...

Страница 18: ...agent representative or dealer of Matrx by Parker shall constitute a warranty by Matrx by Parker or give rise to any liability or obligation of Matrx by Parker Subject to the next sentences Matrx by P...

Страница 19: ...9600 Vacuum gauge scavenger control valve 91525136 Swing arm assembly with mounting hardware 91505112 Pre installation kit shutoff valves 91316043 3 liter breathing bag Mounting Fasteners 91525141 Har...

Страница 20: ...ter Indexed Safety System 92305110 DISS female X DISS female Oxygen 92305111 DISS female X DISS female Nitrous oxide 92305248 DISS female X DISS female Vacuum DISS Hand I Twist 92305288 DISS Hand I Tw...

Отзывы: