June 2005
11-7
1000-A2-GB22-10
11. Maintenance and Services
Switching CP
Cards
When a switchover is requested, the CPX-1000 acknowledges the
request and issues the appropriate alarms and events of the
switchover status.
Upon a switchover, a message on the status bar indicates the status
of the switchover (active or standby). When the switchover is
successful, the previously active card becomes the standby card
and the previously standby card is now the active card.
Before performing a switchover on a CP card, make sure that the
following conditions are present:
two CP cards are inserted in their assigned slots
there are no alarms on either CP card
the states of CP cards if switching from CP-A to CP-B:
the states of CP cards if switching from CP-B to CP-A:
States
CP-A
CP-B
Active
Standby
Administrative
Unlocked
Unlocked
Operational
Enabled
Enabled
Primary
Primary
Secondary
States
CP-B
CP-A
Active
Standby
Administrative
Unlocked
Unlocked
Operational
Enabled
Enabled
Primary
Secondary
Primary
Содержание Jetstream CPX-1000
Страница 1: ...Jetstream JetCraft User s Guide Release 2 6 Document No 1000 A2 GB22 10 June 2005...
Страница 6: ...E June 2005 1000 A2 GB22 10...
Страница 42: ...3 JetCraft Basic Operations 1000 A2 GB22 10 3 10 June 2005...
Страница 64: ...5 CPX 1000 Configuration 1000 A2 GB22 10 5 14 June 2005...
Страница 77: ...June 2005 7 3 1000 A2 GB22 10 7 Interface Groups Figure 7 1 Interface Group Tabular View...
Страница 162: ...9 IAD Profiles and IADs Provisioning 1000 A2 GB22 10 9 52 June 2005...
Страница 181: ...June 2005 10 19 1000 A2 GB22 10 10 Alarms Events and Statistics Figure 10 14 Sample Table Window...
Страница 182: ...10 Alarms Events and Statistics 1000 A2 GB22 10 10 20 June 2005...
Страница 205: ...June 2005 11 23 1000 A2 GB22 10 11 Maintenance and Services Step 3 Select an action button from the bottom of the dialog...
Страница 212: ...11 Maintenance and Services 1000 A2 GB22 10 11 30 June 2005...
Страница 218: ...12 Integrated Monitoring 1000 A2 GB22 10 12 6 June 2005...