
Testing
5-8
7976-A2-GB20-10
August 1998
Device Tests
The Device Tests branch is used to access the only card-level test, the Lamp
Test. To access the Device Tests screen, follow this menu selection sequence:
Main Menu
→
Test
→
Device Tests
main/test/card
Hotwire
Model: 7976
DEVICE TESTS
Test
Command
Status
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Lamp Test:
Start
Inactive
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu
MainMenu
Exit
Î
ÎÎ
Lamp Test
The Lamp test determines whether all LEDs are lighting and functioning properly.
"
Procedure
To test the LEDs:
1. Position the cursor at the Start command next to Lamp Test on the Card
Tests screen.
2. Press Enter.
The Start command is changed to Stop. During the Lamp test, all LEDs blink
simultaneously every second. When you stop the Lamp test, the LEDs are
restored to their normal condition.
3. To stop the lamp test, position the cursor at the Stop command.
4. Press Enter.
Содержание Hotwire 7976
Страница 42: ...Initial Startup and Configuration 3 18 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Страница 56: ...Monitoring the Unit 4 14 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Страница 66: ...Testing 5 10 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Страница 78: ...Security 7 6 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Страница 104: ...Standards Compliance for SNMP Traps B 6 7976 A2 GB20 10 August 1998...
Страница 112: ...Technical Specifications D 2 7976 A2 GB20 10 August 1998...