217
Aquarea air-to-water heat pumps - Planning and installation manual - 02/2022
Appendix
8
34
Menu
Default Setting
Setting Options / Display
7.2
Pump down
To set the pump down
operation�
Pump down operation
ON
7.3
Dry concrete
To dry the concrete (floor, walls,
etc�) during construction�
Do not use this menu for any
other purposes and in period
other than during construction
Edit to set the temperature of dry concrete�
ON / Edit
Edit
Stages: 1
Temperature: 25 °C
Heating temperature
for drying the
concrete�
Select the desired
stages: 1 ~ 10,
range: 1 ~ 99
ON
Confirm the setting temperatures of dry
concrete for each stage�
7.4
Service contact
To set up to 2 contact names
and numbers for the User�
Service engineer’s name and contact number�
Contact 1 / Contact 2
Contact 1 / Contact 2
Contact name or number�
Name / phone icon
Input name and number
Contact name: alphabet a ~ z�
Contact number: 1 ~ 9
Menus
For installer
Содержание WH-ADC0309J3E5
Страница 2: ...Notes...
Страница 221: ...Notes...
Страница 222: ...1002 Aquarea air to water heat pumps Planning and installation manual 02 2022 Notes...
Страница 223: ...1003 Aquarea air to water heat pumps Planning and installation manual 02 2022 Notes...