FP2 S
−
LINK Unit
Operation
5
−
3
5.1 Starting Operation
5.1
Starting Operation
When starting up the main unit (FP2), always turn on the main power supply to the
S
−
LINK (the external power supply) first (or turn both power supplies on at the same
time).
1 S
−
LINK main
power supply
2 Main unit (FP2)
power supply
If a local power supply is being used for I/O devices connected to the system and for
S
−
LINK I/O devices, make sure the local power supply is turned on before the S
−
LINK
main power supply (or turn both power supplies on at the same time).
1 Local power
supply
3 Main unit (FP2)
power supply
2 S
−
LINK main
power supply
(brown)
(blue)
next page
Содержание S-Link FP2
Страница 1: ......
Страница 8: ...Selecting the Right Equipment FP2 S LINK Unit 1 2 ...
Страница 16: ...Specifications FP2 S LINK Unit 2 2 ...
Страница 26: ...I O Assignments FP2 S LINK Unit 3 2 ...
Страница 36: ...Construction and Wiring FP2 S LINK Unit 4 2 ...
Страница 42: ...Operation FP2 S LINK Unit 5 2 ...
Страница 55: ...Chapter 6 Shared Memory 6 1 Configuration of the Shared Memory 6 3 6 2 Shared Memory Reading Program 6 4 ...
Страница 56: ...Shared Memory FP2 S LINK Unit 6 2 ...
Страница 62: ...Shared Memory FP2 S LINK Unit 6 8 6 2 Shared Memory Reading Program ...
Страница 64: ...What To Do If An Error Occurs FP2 S LINK Unit 7 2 ...
Страница 70: ...What To Do If An Error Occurs FP2 S LINK Unit 7 8 7 3 Judging Error Displays ...
Страница 72: ...Appendix FP2 S LINK Unit 8 2 ...
Страница 78: ...Appendix FP2 S LINK Unit 8 8 8 2 S LINK Address Quick Reference Table ...
Страница 80: ...FP2 S LINK Unit Record of changes R 2 ...
Страница 81: ......
Страница 82: ......