1
1-337
User inspection places
Serviceman inspection
places
• Filter and grille cleaning
• Exterior cleaning
• Check the operating status
• Clean the drain pan or things related to the water discharge
• Heat exchanger cleaning
CHECKS AFTER INSTALLATION HAVE COMPLETED
Check the following items after completing installation.
Is there a short circuit with the intake air flow?
Is the insulation secure? (Refrigerant piping)
Are there any errors with the wiring?
Are the terminal screws loose? Tightening torque (Unit: N • m {k
g
f • m})
M4… 1.57 - 1.96 {0.16 - 0.2}, M5... 1.96 - 2.45 {0.2 - 0.25}.
Is the drain water flowing smoothly?
Is the insulation material properly installed?
Is the earth wire securely connected?
Is the front panel and the indoor unit air conditioner firmly fixed and was the installation completed without
any leakage from the refrigerant?
Are the indoor and outdoor units secured firmly installed with bolts at secured locations?
REGARDING DELIVERY TO THE CUSTOMER
Request the customer to review the instruction manual and explain the operating method for the product.
In addition, it is also recommended that regular inspection checks are agreed upon for maintenance.
Refer to the installation instruction manual provided with the indoor unit for the specifications on
the indoor unit installation.
RUN pin
MODE pin
Outdoor main PCB
CHK pin
*MODE pin: factory setting is cooling operation mode.
SM830231-02̲Single̲欧州.indb 337
SM830231-02̲Single̲欧州.indb 337
2014/09/19 13:21:53
2014/09/19 13:21:53