1
1-327
Do not open the 3-way valve until the piping installation is completed.
• It is closed during shipment.
• During installation the side panel may warp if only the flare nut is
loosened and tightened with a torque wrench. As a result, always
be sure to secure to the hexagonal part of the 3-way valve with a
spanner, or other tool.
Refer to the following table for the tightening torque of the 3-way
valve flare nuts.
• If the nuts are over tightened, they may cause the flares to break
or leak.
Do not add additional force to the valve’s cover.
• Using spanners on the cover or valve itself (other than the hexagonal parts) may cause gas leakage.
Avoid using spanners on the cover or parts other than the hexagonal part of the valve.
Precautions when operating the 3-way valve for piping installation
Service port
Hexagonal part
of the valve
Valve shaft
Valve cap
Flare nut
Spanner
(Secure)
Torque
wrench
Silicone sealing agent
(Ensure not to leave any holes)
During the cooling mode operation under low ambient pressure,
the low pressure side of the valve can be prone to freezing.
Secure the flare nut (shared gas side / liquid side) section of the
valve with a silicone sealing agent to prevent this from occurring.
• Use an Allen wrench (Size 4 mm or 6 mm).
Direction to open
[3-way valve operation method]
Opening
Closing
: Open the cover and turn the Allen wrench counter-clockwise until it stops.
: Open the cover and turn the Allen wrench clockwise until it stops.
Ensure not to scratch the inner surface of the valve or the
end of the valve shaft.
• Once adjustments to the valve are completed, ensure to
tighten the valve cap according to the prescribed torque.
Precautions for handling the valve cap
Valve size
Tightening torque
ø9.52
ø15.88
20.6N•m~28.4N•m
{2.1k
g
f•m~2.8k
g
f•m}
48.0N•m~59.8N•m
{4.8k
g
f•m~6.0k
g
f•m}
Use a push-rod with a charge hose.
• Once adjustments to the valve are completed, ensure to
tighten the valve cap according to the prescribed torque.
Precautions for handling the service ports
Tightening torque
10.7N•m~14.7N•m
{1.1k
g
f•m~1.5k
g
f•m}
Ensure that the pipes do not come into contact with the
compressor’s bolts or exterior panel.
There is a risk of condensation from the 3-way valve coming
out between the insulation material and the indoor unit’s
piping when you install the outdoor unit above then the
indoor unit. Ensure to caulk the connection parts.
Precautions for connecting the pipes
Caulking treatment, etc.
Insulation
material
Piping
In high humidity environment, reinforce the insulation material for the refrigerant piping.
Failure to do so may result in condensation on the surface of the insulation material.
Use materials with good heat-resistant properties as the heat insulator for the pipes.
Ensure to insulate both the gas side and liquid side pipes.
If the pipes are not adequately insulated, condensation and water leakages may occur.
Ensure that the current insulation covers the pipes up to the unit’s connecting part.
If the piping is exposed , it may cause condensation or burn (when touch the pipe).
Precautions for insulation installation
Maximum temperature limit of gas or liquid piping exceeds 120 °C
SM830231-02̲Single̲欧州.indb 327
SM830231-02̲Single̲欧州.indb 327
2014/09/19 13:21:52
2014/09/19 13:21:52