Commissioning
15. COMMISSIONING
Commissioning the System
Step 1: Turn on the system and make sure the PowerHub has three
connections:
a. Power, 5 VDC plug into the essential loads
b. Communication cable, PowerHub USB to RS-485 S
c. working internet connection.
Step 2: Confirm lights are blinking on USB connection and Inverter Main
Screen shows Connection to PowerHub
Indicates the Connection to the Control Hub