65
Installation Manual
U
S
B
p
o
rt
T
x
-1
R
x
-1
T
x
-2
R
x
-2
Step 3: Please make sure the jumper pins on Tx-2 and Rx-2.
Step 4: The inverter needs to connect the power, either choices PV, Battery
or Grid. Then use the application software setting your parameters.
Configuring the Hardware
Tx-1
Rx-1
Tx-2
Rx-2
UBS port
Содержание EverVolt Standard EVAC-105-4
Страница 49: ...49 Installation Manual 11 SAMPLE WIRING DIAGRAM Wiring Diagram EVERVOLT MINI STANDARD PLUS ...
Страница 54: ...54 Installation Manual Operation and Display Panel ...
Страница 66: ...66 Installation Manual Configuring the Hardware ...
Страница 68: ...68 Installation Manual Internet Connectivity Options Included PLC option ...
Страница 75: ...75 Installation Manual ...