– 8-15 –
Step 5.2 : After calibration battery in NTC-High, set to 0
°
C and click "OK".
Step 5.3 : After calibration NTC-Low, NTC is complete.
Click on "AGC".
Step 6 :
Press "Next" to continue.
Step 7 :
Before proceeding with Gain and RSSI check, configure the GSM Test Set as follows:
If a CMU200 is used, refer to Annex notex2-1 for Configuration.
If an HP8960 is used, refer to Annex notes2-2 for Configuration.
Содержание EB-X100
Страница 68: ... 8 19 ...
Страница 69: ... 8 20 ...