23
6 Using the System
3
Select the calculation target of power distribution.
(3) Select T/S ON+OFF time , T/S ON time , or No Distrib. .
- T/S ON + OFF time
To be selected when taking power both for the outdoor and indoor units to make distribution
calculation.
- T/S ON time
To be selected when taking power only for the outdoor unit to make distribution calculation.
- No Distrib.
To be selected when distribution calculation for gas and electricity is unnecessary.
4
Select the energy savings distribution settings.
(4) Select Each O/D sys. or Each Dist. Gr. .
This item cannot be selected when No Distrib. has been set for “(3) Calc. target of power
distribution”.
Select a range where the energy savings effect in 3 WAY units can be re
fl
ected on the
distribution calculation.
- Each O/D sys.
The energy savings operation in 3 WAY units is re
fl
ected only on the air conditioning
distribution for the tenant for the outdoor system.
- Each Dist.Gr.
The energy savings operation in 3 WAY units is re
fl
ected on air conditioning distributions
for all the tenants in the overall distribution group including them.
(However, this is effective only when plural distribution groups have been set.)
5
In the Language pull-down menu (5), select the language you would like to use.
Main
Sub
1
1
5
5
CZ-256ESMC2_EN.indb 23
CZ-256ESMC2_EN.indb 23
9/14/2011 3:16:45 PM
9/14/2011 3:16:45 PM
Содержание CZ-256ESMC2
Страница 3: ...Centralized Control System CZ 256ESMC2 INTELLIGENT CONTROLLER Operation Manual ...
Страница 97: ...95 15 Specifications ...
Страница 102: ...100 Memo ...
Страница 103: ......