33
CUTTING AND FLARING THE PIPING
1 Please cut using pipe cutter and then remove the burrs.
2 Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused. Turn the piping end
down to avoid the metal powder entering the pipe.
3 Please make flare after inserting the flare nut onto the copper pipes.
Содержание CS-MRE7PKE
Страница 15: ...15 4 Location of Controls and Components 4 1 Indoor Unit 4 2 Outdoor Unit 4 3 Remote Control...
Страница 16: ...16 5 Dimensions 5 1 Indoor Unit...
Страница 17: ...17 5 2 Outdoor Unit...
Страница 18: ...18 6 Refrigeration Cycle Diagram...
Страница 19: ...19 7 Block Diagram 7 1 Indoor Unit...
Страница 20: ...20 7 2 Outdoor Unit...
Страница 21: ...21 8 Wiring Connection Diagram 8 1 Indoor Unit...
Страница 22: ...22 8 2 Outdoor Unit...
Страница 23: ...23 9 Electronic Circuit Diagram 9 1 Indoor Unit...
Страница 24: ...24 9 2 Outdoor Unit...
Страница 26: ...26 10 2 Outdoor Unit...
Страница 53: ...53 17 3 Self Diagnosis Function...
Страница 54: ...54...
Страница 87: ...87...
Страница 88: ...88 19 1 1 2 CS MRE9PKE...
Страница 89: ...89...
Страница 90: ...90 19 1 2 Two Indoor Unit Operation 19 1 2 1 CS MRE7PKE x2...
Страница 91: ...91...
Страница 92: ...92 19 1 2 2 CS MRE9PKE CS MRE7PKE...
Страница 93: ...93...
Страница 94: ...94 19 2 Operation Characteristics CU 2RE18PBE 19 2 1 One Indoor Unit Operation 19 2 1 1 CS MRE7PKE...
Страница 95: ...95...
Страница 96: ...96 19 2 1 2 CS MRE9PKE...
Страница 97: ...97...
Страница 98: ...98 19 2 1 3 CS MRE12PKE...
Страница 99: ...99...
Страница 100: ...100 19 2 2 Two Indoor Unit Operation 19 2 2 1 CS MRE7PKE x2...
Страница 101: ...101...
Страница 102: ...102 19 2 2 2 CS MRE9PKE x2...
Страница 103: ...103...
Страница 104: ...104 19 2 2 3 CS MRE12PKE x2...
Страница 105: ...105...