41
11.3.3 Evacuation of the Equipment
1 Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way
valve.
o
Be sure to connect the end of the charging hose with the push pin to the service port.
2 Connect the center hose of the charging set to a vacuum pump.
3 Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0
cmHg (0 MPa) to -76 cmHg (-0.1 MPa). Then evacuate the air approximately ten minutes.
4 Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the
gauge does not move after approximately five minutes.
Note: BE SURE TO TAKE THIS PROCEDURE IN ORDER TO AVOID REFRIGERENT GAS LEAKAGE.
5 Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve.
6 Tighten the service port caps of the 3-way valve at a torque of 18 N•m with a torque wrench.
7 Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN”
using a hexagonal wrench (4 mm).
8 Mount valve caps onto the 2-way valve and the 3-way valve.
o
Be sure to check for gas leakage.
If gauge needle does not move from 0 cmHg (0 MPa) to -76 cmHg (-0.1 MPa), in the step
e
above take the following measure:
-
If the leak stops when the piping connections are tightened further, continue working from step
e
.
-
If the leak does not stop when the connections are retightened, repair location of leak.
-
Do not release refrigerant during piping work for installation and reinstallation.
-
Take care of the liquid refrigerant, it may cause frostbite.
Содержание CS-C12MKV
Страница 12: ...12 4 Location of Controls and Components 4 1 Indoor Unit 4 2 Outdoor Unit 4 3 Remote Control ...
Страница 13: ...13 5 Dimensions 5 1 Indoor Unit 5 1 1 CS C9MKV CS C12MKV ...
Страница 14: ...14 5 1 2 CS C18MKV CS C24MKV CS C28MKV ...
Страница 15: ...15 5 2 Outdoor Unit 5 2 1 CU C9MKV 5 2 2 CU C12MKV ...
Страница 16: ...16 5 2 3 CU C18MKV CU C24MKV CU C28MKV ...
Страница 17: ...17 6 Refrigeration Cycle Diagram ...
Страница 18: ...18 7 Block Diagram 7 1 1 CS C9MKV CU C9MKV CS C12MKV CU C12MKV ...
Страница 19: ...19 7 1 2 CS C18MKV CU C18MKV CS C24MKV CU C24MKV ...
Страница 20: ...20 7 1 3 CS C28MKV CU C28MKV ...
Страница 26: ...26 9 Electronic Circuit Diagram 9 1 CS C9MKV CU C9MKV ...
Страница 27: ...27 9 2 CS C12MKV CU C12MKV ...
Страница 28: ...28 9 3 CS C18MKV CU C18MKV ...
Страница 29: ...29 9 4 CS C24MKV CU C24MKV ...
Страница 30: ...30 9 5 CS C28MKV CU C28MKV ...
Страница 31: ...31 10 Printed Circuit Board 10 1 Indoor Unit 10 1 1 Main Printed Circuit Board 10 1 1 1 CS C9MKV CS C12MKV ...
Страница 32: ...32 10 1 1 2 CS C18MKV CS C24MKV CS C28MKV ...
Страница 34: ...34 10 1 6 Human Activity Sensor Printed Circuit Board ...
Страница 46: ...46 12 1 2 Cooling Operation Time Diagram For CS C18MK CU C18MK CS C24MK CU C24MK and CS C28MK CU C28MK ...
Страница 48: ...48 12 2 2 Soft Dry Operation Time Diagram For CS C18MK CU C18MK CS C24MK CU C24MK and CS C28MK CU C28MK ...
Страница 77: ...77 Figure 3 Figure 4 16 1 1 3 To remove discharge grille Figure 5 ...
Страница 79: ...79 Figure 9 Figure 10 ...
Страница 81: ...81 16 2 1 3 To remove power electronic controller Figure 13 Figure 14 Figure1 5 ...
Страница 83: ...83 Figure 19 Figure 20 Figure 21 ...
Страница 85: ...85 16 3 1 3 To remove power electronic controller Figure 24 Figure 8 Figure 9 ...
Страница 87: ...87 Figure 30 Figure 31 Figure 32 ...
Страница 88: ...88 17 Technical Data 17 1 Thermostat Characteristics Cooling Soft Dry ...