CHAPTER 5
25
Fixing the boom, hydraulic hoses, and cables
1. Mounting bolt CPHI0471 (10 kg sledgehammer) + cover CP spacer EK-347M + screw ES-
637M (position A)
2. Mounting bolt CPHI0473 (10 kg sledgehammer) + cover CP spacer EK-347M + screw ES-
637M (position A)
3. Mounting the hydraulic hoses / cables from the stand-on platform -> boom / cylinder.
4. Establish voltage supply on main boom by connecting connectors XC2 and XC3.
5. Fit lightning protection system in end position.
6. Fit obstacle light in end position and connect modules NAi.
7. Provide power supply for SCADA.
* Illustration may differ from this project crane
Caution!
Installation of the screws must be carried out with the utmost care! An
incorrectly mounted load arm may cause accidents!
Fit screws as per list of torques.
Torque moment of the screw ES637M is 505Nm
Paint to be repaired on this connection area
Содержание PSM400-16
Страница 10: ...CHAPTER 3 7 CHAPTER 3 Overview of tools In this chapter General 8 Check of threaded fasteners 9...
Страница 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Страница 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Страница 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Страница 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Страница 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...