CHAPTER 5
24
Preserving the screw joints after tightening
After having installed the crane and tightened the bolts carry out the following preservation works:
Contact gap between flanges
•
Remove contaminations and degrease surfaces (see no. 3 in illustration below).
•
Apply Hempadur Mastic 45880 approx. 280 µm thick.
•
Seal the contact gap with PUR putty.
•
Apply Hempathane 55210 approx. 40µm thick.
Screws, nuts, and washers
•
Remove contaminations and degrease surfaces (see nos. 1, 2 and 4 in drawing below).
•
Apply Hempadur Mastic 45880 approx. 280 µm thick.
•
Apply Hempathane 55210 approx. 40µm thick.
Before coating adhere to the drying times depending on thickness and temperature and in accordance with
the manufacturer’s datasheet.
1
2
3
4
Note!
Make regular checks of the settings to be executed according to the operator’s
manual.
Содержание PSM400-16
Страница 10: ...CHAPTER 3 7 CHAPTER 3 Overview of tools In this chapter General 8 Check of threaded fasteners 9...
Страница 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Страница 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Страница 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Страница 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Страница 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...