CHAPTER 4
13
Crane handling
Fasten the crane according to the following picture and bear in mind that the crane components should be
lifted only in horizontal position.
Load arm:
•
Weight (1) c. 1,607 kg*.
•
Use lugs (2) for attaching the unit.
•
Connect lifting cylinder with boom (3).
* Actual weights will be mentioned on the delivery documents
* Illustration may differ from this project crane
Содержание PSM400-16
Страница 10: ...CHAPTER 3 7 CHAPTER 3 Overview of tools In this chapter General 8 Check of threaded fasteners 9...
Страница 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Страница 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Страница 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Страница 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Страница 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...