CHAPTER 5
20
Crane mounting
Before placing the crane on the pre-mounted crane base make sure that the flat surfaces of the individual
components are thoroughly cleaned and any weld notches, paint spots, fins and other uneven spots are
removed.
Crane support:
The base flanges must be even. This requires machine manufacturing. They have to be free of any dirt,
oil, grease and loose scales, fins or chippings. The evenness is to be compared with an ideal even
surface which is exactly vertical to the axle. The top of the base flanges must be free of any paint*,
grease, oil, and weld spots.
* In case of exceptions (coated surfaces) contact your Palfinger MARINE partner.
Cleaned flat surfaces
Содержание PSM400-16
Страница 10: ...CHAPTER 3 7 CHAPTER 3 Overview of tools In this chapter General 8 Check of threaded fasteners 9...
Страница 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Страница 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Страница 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Страница 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Страница 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...