
CHAPTER 9
40
Checklist after start-up
Before delivering the crane to the customer it is required to make a final check following the list below.
Check list
Yes
No
Has the crane been lubricated?
O
O
Has the crane been checked for leakages?
O
O
Has the oil level in the hydraulic system been checked?
O
O
Have damages (paint, etc.) been removed?
O
O
Have electrical components been checked for damage?
O
O
Have all necessary signs been attached?
O
O
Has the warranty booklet been completed?
O
O
Did you check the remote-control unit?
O
O
Did you set the slewing ranges correctly?
O
O
Now your crane is ready for use!
Содержание PSM400-16
Страница 10: ...CHAPTER 3 7 CHAPTER 3 Overview of tools In this chapter General 8 Check of threaded fasteners 9...
Страница 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Страница 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Страница 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Страница 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Страница 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...