SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
6-10
– JLG Lift –
3121217
3.
Hydraulic Tank
Lube Point(s) - Fill Cap
Capacity -
Prior to S/N 51941 - 15 gal. tank (56.7 L)
S/N 51941 to present - 15.9 gal. system (56.7L)
12.4 gal. (46.9 L) to Full Mark
Lube - HO
Interval - Check Level daily; Change every 2 years or
1200 hours of operation.
4.
Hydraulic Filter
Interval - Change after first 50 hrs. and every 6 months
or 300 hrs. thereafter or as indicated by Condition
Indicator.
Comments - Under certain conditions, it may be
necessary to replace the filter on a more frequent
basis.
www.
duma
-rent.com
Содержание JLG E600
Страница 2: ...www duma rent com...
Страница 57: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 11 Figure 4 4 Lifting and Tie Down Chart www duma rent com...
Страница 62: ...SECTION 4 MACHINE OPERATION 4 16 JLG Lift 3121217 Figure 4 5 Decal Installation Sheet 1 of 4 www duma rent com...
Страница 63: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 17 Figure 4 6 Decal Installation Sheet 2 of 4 www duma rent com...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 18 JLG Lift 3121217 Figure 4 7 Decal Installation Sheet 3 of 4 www duma rent com...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 19 Figure 4 8 Decal Installation Sheet 4 of 4 www duma rent com...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 28 JLG Lift 3121217 NOTES www duma rent com...
Страница 79: ...SECTION 5 EMERGENCY PROCEDURES 3121217 JLG Lift 5 5 Figure 5 1 Manual Descent Decal www duma rent com...
Страница 80: ...SECTION 5 EMERGENCY PROCEDURES 5 6 JLG Lift 3121217 NOTES www duma rent com...
Страница 96: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 16 JLG Lift 3121217 NOTES www duma rent com...
Страница 100: ...www duma rent com...
Страница 101: ...www duma rent com...