SECTION 1 - SAFETY PRECAUTIONS
1-2
– JLG Lift –
3121217
• Read, understand, and obey all DANGERS, WARNINGS,
CAUTIONS, and operating instructions on the machine
and in this manual.
• Use the machine in a manner which is within the scope of
its intended application set by JLG.
• All operating personnel must be familiar with the emer-
gency controls and emergency operation of the machine
as specified in this manual.
• Read, understand, and obey all applicable employer,
local, and governmental regulations as they pertain to
operation of the machine.
Workplace Inspection
• The operator is to take safety measures to avoid all haz-
ards in the work area prior to machine operation.
• Do not operate or raise the platform while on trucks, trail-
ers, railway cars, floating vessels, scaffolds or other equip-
ment unless approved in writing by JLG.
• Do not operate the machine in hazardous environments
unless approved for that purpose by JLG.
• Be sure that the ground conditions are able to support the
maximum load shown on the decals located on the
machine.
• This machine can be operated in temperatures of 0
o
F to
104
o
F (-20
o
C to 40
o
C). Consult JLG for operation out-
side this range.
Machine Inspection
• Before machine operation, perform inspections and func-
tional checks. Refer to Section 2 of this manual for
detailed instructions.
• Do not operate this machine until it has been serviced and
maintained according to requirements specified in the
Service and Maintenance Manual.
• Be sure the footswitch and all other safety devices are
operating properly. Modification of these devices is a
safety violation.
MODIFICATION OR ALTERATION OF AN AERIAL WORK PLATFORM
SHALL BE MADE ONLY WITH WRITTEN PERMISSION FROM THE MANU-
FACTURER
• Do not operate any machine on which safety or instruction
placards or decals are missing or illegible.
• Avoid any buildup of debris on the platform floor. Keep
mud, oil, grease, and other slippery substances from foot-
wear and platform floor.
www.
duma
-rent.com
Содержание JLG E600
Страница 2: ...www duma rent com...
Страница 57: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 11 Figure 4 4 Lifting and Tie Down Chart www duma rent com...
Страница 62: ...SECTION 4 MACHINE OPERATION 4 16 JLG Lift 3121217 Figure 4 5 Decal Installation Sheet 1 of 4 www duma rent com...
Страница 63: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 17 Figure 4 6 Decal Installation Sheet 2 of 4 www duma rent com...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 18 JLG Lift 3121217 Figure 4 7 Decal Installation Sheet 3 of 4 www duma rent com...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 19 Figure 4 8 Decal Installation Sheet 4 of 4 www duma rent com...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 28 JLG Lift 3121217 NOTES www duma rent com...
Страница 79: ...SECTION 5 EMERGENCY PROCEDURES 3121217 JLG Lift 5 5 Figure 5 1 Manual Descent Decal www duma rent com...
Страница 80: ...SECTION 5 EMERGENCY PROCEDURES 5 6 JLG Lift 3121217 NOTES www duma rent com...
Страница 96: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 16 JLG Lift 3121217 NOTES www duma rent com...
Страница 100: ...www duma rent com...
Страница 101: ...www duma rent com...