SECTION 5 - EMERGENCY PROCEDURES
5-4
– JLG Lift –
3121217
SWING LEFT
1.
Install the spool plug in the location shown.
2.
Install the handle into the hand pump and pump the
handle until the desired platform position reached.
3.
Remove the handle from the hand pump.
REMOVE ALL SPOOL PLUGS BEFORE RETURNING UNIT TO SERVICE.
www.
duma
-rent.com
Содержание JLG E600
Страница 2: ...www duma rent com...
Страница 57: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 11 Figure 4 4 Lifting and Tie Down Chart www duma rent com...
Страница 62: ...SECTION 4 MACHINE OPERATION 4 16 JLG Lift 3121217 Figure 4 5 Decal Installation Sheet 1 of 4 www duma rent com...
Страница 63: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 17 Figure 4 6 Decal Installation Sheet 2 of 4 www duma rent com...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 18 JLG Lift 3121217 Figure 4 7 Decal Installation Sheet 3 of 4 www duma rent com...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 19 Figure 4 8 Decal Installation Sheet 4 of 4 www duma rent com...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 28 JLG Lift 3121217 NOTES www duma rent com...
Страница 79: ...SECTION 5 EMERGENCY PROCEDURES 3121217 JLG Lift 5 5 Figure 5 1 Manual Descent Decal www duma rent com...
Страница 80: ...SECTION 5 EMERGENCY PROCEDURES 5 6 JLG Lift 3121217 NOTES www duma rent com...
Страница 96: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 16 JLG Lift 3121217 NOTES www duma rent com...
Страница 100: ...www duma rent com...
Страница 101: ...www duma rent com...