SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-10
– JLG Lift –
3121217
GENERAL
Begin your Walk-Around Inspection at item 1, as noted on
the diagram. Continue to your right (counterclockwise
viewed from the top) checking each item in sequence for
the conditions listed in the following checklist.
TO AVOID POSSIBLE INJURY BE SURE MACHINE POWER IS OFF DUR-
ING “WALK-AROUND INSPECTION”.
DO NOT OVERLOOK VISUAL INSPECTION OF CHASSIS UNDERSIDE.
CHECKING THIS AREA MAY RESULT IN DISCOVERY OF CONDITIONS
WHICH COULD CAUSE EXTENSIVE MACHINE DAMAGE.
NOTE:
On each item, make sure there are no loose or missing
parts, that they are securely fastened and that no visible
damage exists in addition to any other criteria men-
tioned.
1.
Platform Assembly - Platform mounting pins secure.
Footswitch in good working order; not modified, dis-
abled or blocked.
2.
Platform & Ground Control Console - Switches and
control levers; placards secure and legible; control
lever and switches return to neutral; control lever lock
functions properly; emergency stop switch functions
properly; control markings legible.
3.
Rotator Cylinder - Motor and cylinder pins secure;
hydraulic hoses.
4.
All Hydraulic Cylinders - No visible damage; Pivot pins
and hydraulic hoses undamaged, not leaking.
5.
Boom - Pivot pins secure; Upright in vertical position.
See Note.
6.
Drive Axle and Motor - See Note
7.
Wheel/Tire Assembly - No loose or missing lug nuts,
proper inflation (pneumatic). Inspect for worn tread,
cuts, tears, or other discrepancies. Inspect wheels for
damage and corrosion
8.
Frame (top and underside) - See Note.
Figure 2-5. Daily Walk-Around Inspection - Sheet 2 of 4
www.
duma
-rent.com
Содержание JLG E600
Страница 2: ...www duma rent com...
Страница 57: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 11 Figure 4 4 Lifting and Tie Down Chart www duma rent com...
Страница 62: ...SECTION 4 MACHINE OPERATION 4 16 JLG Lift 3121217 Figure 4 5 Decal Installation Sheet 1 of 4 www duma rent com...
Страница 63: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 17 Figure 4 6 Decal Installation Sheet 2 of 4 www duma rent com...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 18 JLG Lift 3121217 Figure 4 7 Decal Installation Sheet 3 of 4 www duma rent com...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121217 JLG Lift 4 19 Figure 4 8 Decal Installation Sheet 4 of 4 www duma rent com...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 28 JLG Lift 3121217 NOTES www duma rent com...
Страница 79: ...SECTION 5 EMERGENCY PROCEDURES 3121217 JLG Lift 5 5 Figure 5 1 Manual Descent Decal www duma rent com...
Страница 80: ...SECTION 5 EMERGENCY PROCEDURES 5 6 JLG Lift 3121217 NOTES www duma rent com...
Страница 96: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 16 JLG Lift 3121217 NOTES www duma rent com...
Страница 100: ...www duma rent com...
Страница 101: ...www duma rent com...