
Revision History
This section contains a revision history for this document.
Date
Description
October 2014
Initial Release
January 2015
Renamed the document Acme Packet 4600
Installation and Maintenance Guide.
Removed Regulatory Specifications and
Certifications from Chapter 7- Specifications.
Inserted reference to Acme Packet Platforms
Safety and Compliance Guide.
Removed section of the Maintenance Chapter
on removing and installing SODIMMs.
March 2015
Added a section on the installation of
transceivers on the signalling and media ports,
Corrected ambiguities concerning the speeds
of the signalling and media ports.
April 2015
Entered notes pointing out that after you
initially install the Acme Packet 4600 or
replace the Solid State Drive (SSD), you must
format the drive.
Inserted caveats to confirm that Acme Packet
6300 hardware installation documentation
satisfies NEBS (Network Equipment-Building
System) requirements.
July 2020
Updated NIU Removal and Installation
sections to clarify procedures.
December 2020
Adds note about multiple sensors reporting
alarms with the same Alarm ID.
9