36
Acme Packet 4500 Hardware Installation and Maintenance Guide
SYSTEM INSTALLATION
Unpacking the Acme
Packet 4500
To unpack the Acme Packet 4500:
1.
Inspect the external packing materials and note if they are damaged in any way.
2.
Open the exterior box.
3.
Unpack the contents of the Acme Packet 4500 shipment.
4.
Locate the packing list that comes with the Acme Packet 4500 shipment, located
outside of shipment box #1.
5.
Confirm that all of the components listed in the shipping box contents tables are
present and in good condition.
If you discover that any of the parts are missing or were damaged in shipment,
send an email to [email protected] to request assistance.
Mounting Hardware
The following are images of hardware used for the Acme Packet 4500 mounting
procedures.
•
Front mounting ears (2 x shipped) are for use win fastening the chassis to the
equipment rack.
Figure 4 - 32. Front Mounting Ears
•
The mounting slide assembly (2 x shipped), as shipped, with chassis slide
inserted into stationary slide holds each side of the chassis to the equipment
rack.
Figure 4 - 33. Mounting Slide Assembly
Содержание Acme Packet 4500
Страница 1: ...Acme Packet 4500 Hardware Installation and Maintenance Guide Formerly Net Net 4500 April 2015...
Страница 6: ...vi Acme Packet 4500 Hardware Installation and Maintenance Guide...
Страница 10: ...4 Acme Packet 4500 Hardware Installation and Maintenance Guide ABOUT THIS GUIDE...
Страница 14: ...8 Acme Packet 4500 Hardware Installation and Maintenance Guide SAFETY...
Страница 38: ...32 Acme Packet 4500 Hardware Installation and Maintenance Guide GRAPHIC DISPLAY...
Страница 74: ...68 Acme Packet 4500 Hardware Installation and Maintenance Guide STARTUP...
Страница 110: ...104 Acme Packet 4500 Hardware Installation and Maintenance Guide GLOSSARY...
Страница 114: ...108 Acme Packet 4500 Hardware Installation and Maintenance Guide I INDEX...