MAINTENANCE
Acme Packet 4500 Hardware Installation and Maintenance Guide
91
Caution
To prevent damage to the optical lens, We recommend that
the protective dust cover stay on the optical transceiver port
when the GbE physical interface card is not cabled.
Removing an Optical
Transceiver
To remove the optical transceiver on an NIU SFP port:
1.
Unplug all GbE fiber optic cables from the optical transceiver to be replaced.
Figure 6 - 128. Bale Clasps in Rest Position
2.
Pull the bale clasp latch out and down. It will pivot downwards on its hinge.
Figure 6 - 129. Bale Clasp Lowered
3.
Holding the extended bale clasp latch, pull the optical transceiver fully out of its
socket in the physical interface card.
Figure 6 - 130. Removing the SFP
Replacing an Optical
Transceiver
To replace the optical transceiver:
1.
Slide the replacement optical transceiver into the SFP socket on the NIU.
2.
Flip the bale clasp latch back into the rest position.
Содержание Acme Packet 4500
Страница 1: ...Acme Packet 4500 Hardware Installation and Maintenance Guide Formerly Net Net 4500 April 2015...
Страница 6: ...vi Acme Packet 4500 Hardware Installation and Maintenance Guide...
Страница 10: ...4 Acme Packet 4500 Hardware Installation and Maintenance Guide ABOUT THIS GUIDE...
Страница 14: ...8 Acme Packet 4500 Hardware Installation and Maintenance Guide SAFETY...
Страница 38: ...32 Acme Packet 4500 Hardware Installation and Maintenance Guide GRAPHIC DISPLAY...
Страница 74: ...68 Acme Packet 4500 Hardware Installation and Maintenance Guide STARTUP...
Страница 110: ...104 Acme Packet 4500 Hardware Installation and Maintenance Guide GLOSSARY...
Страница 114: ...108 Acme Packet 4500 Hardware Installation and Maintenance Guide I INDEX...