Fig.5-3 Burning aperture on Fair
6.1.3 Other maintenance work
The maintenance workof A63.7080/81 also includes cleaning the liner, cleaning the
scanning coil, cleaning the pole piece under the objective lens and the entire
electronic optical column , or moving the A63.7080/81 to another place. Such
maintenance work must be done by professional engineers appointed by the
manufacturer or engineers authorized by the manufacturer and specially trained and
certified by the manufacturer.
6.2 Inspection Period
It is suggested to inspect the scanning electron microscope under normal working
condition every year to eliminate the potential trouble.
6.3Normal maintenance procedure
Reference to the service procedure
Содержание A63.7080
Страница 1: ...A63 7080 81 Scanning Electron Microscope SEM Instruction Manual ...
Страница 17: ......
Страница 20: ...Fig 3 7 The function button and state display of the scan control window ...
Страница 26: ...4 Automatic sample stage 4 1Sample stage control interface ...
Страница 35: ...Function The following table contains information on the components of the Settings tab ...