Mounting and Connecting Devices
ZX-GT User’s Manual
1
BEFORE USE
27
Mounting the Controller
1
Hook the connector end of the
Controller onto the DIN track.
Always hook the connector end of the
Controller onto the DIN track first. Mounting
strength may decrease if the I/O cable end
is hooked onto the DIN track first.
2
Push the Controller down onto
the DIN track until the hook on the
I/O cable side is locked.
After mounting the Controller on the DIN
track, attach the end plates (sold
separately) on both sides of the Controller.
Removal
1
Push the Controller up towards
the connector side.
2
Lift up the Controller from the
connector end, and remove it
from the DIN track.
1
2
Important
Important
DIN track (sold separately)
PFP-100N (1 m)
PFP-50N (0.5 m)
PFP-100N2 (1 m)
End plate
1
2
zx_gt.book Page 27 Wednesday, May 30, 2007 3:29 PM
Содержание ZX-GT -
Страница 1: ...Smart Sensor Cat No Z263 E1 01 ZX GT Series USER S MANUAL...
Страница 12: ...ZX GT User s Manual 10 MEMO...
Страница 17: ...CONTENTS ZX GT User s Manual 15 MEMO...
Страница 20: ...Operation Step Guide ZX GT User s Manual 18 MEMO...
Страница 42: ...Initializing Controller Settings ZX GT User s Manual 40 MEMO...
Страница 50: ...Functions and Operations during Operation RUN Mode 48 ZX GT User s Manual MEMO...
Страница 74: ...Setting Output Conditions ZX GT User s Manual 72 5 Check that setting of correction values is completed SUB...
Страница 90: ...Special Functions ZX GT User s Manual 88 MEMO...
Страница 157: ...Compliance with EC Directives ZX GT User s Manual 5 APPENDICES 155 MEMO...
Страница 162: ...Quick Reference for Displays ZX GT User s Manual 160 MEMO...