![Omron fz5 series Скачать руководство пользователя страница 198](http://html1.mh-extra.com/html/omron/fz5-series/fz5-series_hardware-setup-manual_742694198.webp)
5 Setup and Wiring
5 - 28
Vision System FZ5 series Hardware Setup Manual (Z423)
• Make sure to tighten all installation screws securely.
• Maintain a minimum clearance of 50 mm above the controller to improve air circulation.
A minimum clearance of 25 mm between other devices must also be maintained on the right, left and
back sides of product.
• Do not install the product immediately above significant heat sources, such as heaters, transformers,
or large-capacity resistors.
• Do not install the product in a cabinet containing high-voltage equipment.
• Do not install the Sensor Controller within 200 mm of power cables.
Note Fix without removing the insulation leg because neither the ventilation route is closed nor the case are con-
nected with FG.
Mounting of the FZ5-L Series
51
4-M4 depth 6.5
Insulation leg
100
59
10.5
Содержание fz5 series
Страница 8: ...Manual Structure 6 Vision System FZ5 series Hardware Setup Manual Z423...
Страница 50: ...1 Confirm the Package 1 14 Vision System FZ5 series Hardware Setup Manual Z423...
Страница 162: ...3 Configuration 3 100 Vision System FZ5 series Hardware Setup Manual Z423...
Страница 285: ......