![Omron fz5 series Скачать руководство пользователя страница 187](http://html1.mh-extra.com/html/omron/fz5-series/fz5-series_hardware-setup-manual_742694187.webp)
5 - 17
5 Setup and Wiring
Vision System FZ5 series Hardware Setup Manual (Z423)
5-3
Senso
r C
o
n
troller In
stallation
5
5-
3-3 F
H-L
S
e
rie
s
Mounting of the Back Side
• Recommended tightening torque: 0.54 N
•
m to 0.6 N
•
m
• The tolerance:
±
0.2 mm
Clearance: 50 mm
Clearance: 50 mm
Clearance: 50 mm
Clearance: 30 mm
Clearance: 30 mm
Clearance: 30 mm
Clearance: 30 mm
100
55
Four, M4 depth 6.5
59
10.5
Содержание fz5 series
Страница 8: ...Manual Structure 6 Vision System FZ5 series Hardware Setup Manual Z423...
Страница 50: ...1 Confirm the Package 1 14 Vision System FZ5 series Hardware Setup Manual Z423...
Страница 162: ...3 Configuration 3 100 Vision System FZ5 series Hardware Setup Manual Z423...
Страница 285: ......