![Omron EJ1 - 07-2008 Скачать руководство пользователя страница 60](http://html1.mh-extra.com/html/omron/ej1-07-2008/ej1-07-2008_operation-manual_743567060.webp)
41
Simple I/O Allocation
Section 4-2
• TC4 Selected (DIP switch pin 2 ON):
IN Area: 26 to 86 words (= 26 + n
×
4 words)
OUT Area: 14 to 74 words (= 14 + n
×
4 words)
Note
1.
Data that is not included in the allocation data can be controlled and mon-
itored using explicit messages.
2.
When simple I/O allocation is used, the type of data allocated and the al-
location order cannot be changed. To add or change types of data, or to
specify the allocation order, allocate I/O from the Configurator.
4-2-2
Simple I/O Allocation Area Configuration
The configuration of the IN Area and OUT Areas for simple I/O allocations is
shown here for the TC2 and TC4. (The process values (PVs) and set points
(SPs) have the same contents as the PV and SP settings in the Temperature
Controller variable area.)
Simple I/O Allocations
with TC2 Selected
(DIP switch pin 2 OFF)
Address
OUT Area
IN Area
First word + 0
OUT Enable Bit
(See note 1.) Communications Status
---
First word + 1
Not used.
(See note 1.) Communications Error Status
---
First word + 2
RUN/STOP (TC2: #00
−
#07)
(See note 1.) RUN/STOP (TC2: #00
−
#07)
(See note 1.)
First word + 3
RUN/STOP (TC2: #08
−
#15)
(See note 1.) RUN/STOP (TC2: #08
−
#15)
(See note 1.)
First word + 4
AT Execute/Cancel (TC2: #00
−
#07) (See note 1.) AT Execute/Cancel (TC2: #00
−
#07)
(See note 1.)
First word + 5
AT Execute/Cancel (TC2: #08
−
#15) (See note 1.) AT Execute/Cancel (TC2: #08
−
#15)
(See note 1.)
First word + 6
#0 ch1 Present Bank Set Point
(See note 2.) Alarm 1 (TC2: #00
−
#07)
(See note 1.)
First word + 7
#0 ch2 Present Bank Set Point
(See note 2.) Alarm 1 (TC2: #08
−
#15)
(See note 1.)
First word + 8
#1 ch1 Present Bank Set Point
(See note 2.) Alarm 2 (TC2: #00
−
#07)
(See note 1.)
First word + 9
#1 ch2 Present Bank Set Point
(See note 2.) Alarm 2 (TC2: #08
−
#15)
(See note 1.)
First word + 10
#2 ch1 Present Bank Set Point
(See note 2.) Alarm 3 (TC2: #00
−
#07)
(See note 1.)
First word + 11
#2 ch2 Present Bank Set Point
(See note 2.) Alarm 3 (TC2: #08
−
#15)
(See note 1.)
First word + 12
#3 ch1 Present Bank Set Point
(See note 2.) HB Alarm (TC2: #00
−
#07)
(See note 1.)
First word + 13
#3 ch2 Present Bank Set Point
(See note 2.) HB Alarm (TC2: #08
−
#15)
(See note 1.)
First word + 14
#4 ch1 Present Bank Set Point
(See note 2.) #0 ch1 Process Value
(See note 2.)
First word + 15
#4 ch2 Present Bank Set Point
(See note 2.) #0 ch2 Process Value
(See note 2.)
First word + 16
#5 ch1 Present Bank Set Point
(See note 2.) #1 ch1 Process Value
(See note 2.)
First word + 17
#5 ch2 Present Bank Set Point
(See note 2.) #1 ch2 Process Value
(See note 2.)
First word + 18
#6 ch1 Present Bank Set Point
(See note 2.) #2 ch1 Process Value
(See note 2.)
First word + 19
#6 ch2 Present Bank Set Point
(See note 2.) #2 ch2 Process Value
(See note 2.)
First word + 20
#7 ch1 Present Bank Set Point
(See note 2.) #3 ch1 Process Value
(See note 2.)
First word + 21
#7 ch2 Present Bank Set Point
(See note 2.) #3 ch2 Process Value
(See note 2.)
First word + 22
#8 ch1 Present Bank Set Point
(See note 2.) #4 ch1 Process Value
(See note 2.)
First word + 23
#8 ch2 Present Bank Set Point
(See note 2.) #4 ch2 Process Value
(See note 2.)
First word + 24
#9 ch1 Present Bank Set Point
(See note 2.) #5 ch1 Process Value
(See note 2.)
First word + 25
#9 ch2 Present Bank Set Point
(See note 2.) #5 ch2 Process Value
(See note 2.)
First word + 26
#10 ch1 Present Bank Set Point
(See note 2.) #6 ch1 Process Value
(See note 2.)
First word + 27
#10 ch2 Present Bank Set Point
(See note 2.) #6 ch2 Process Value
(See note 2.)
First word + 28
#11 ch1 Present Bank Set Point
(See note 2.) #7 ch1 Process Value
(See note 2.)
First word + 29
#11 ch2 Present Bank Set Point
(See note 2.) #7 ch2 Process Value
(See note 2.)
First word + 30
#12 ch1 Present Bank Set Point
(See note 2.) #8 ch1 Process Value
(See note 2.)
Содержание EJ1 - 07-2008
Страница 1: ...DeviceNet Communications Unit for EJ1 Temperature Controllers Cat No H155 E1 02 OPERATION MANUAL...
Страница 2: ...DeviceNet Communications Unit for EJ1 Temperature Controllers Operation Manual Revised July 2008...
Страница 3: ...iv...
Страница 19: ...xx...
Страница 33: ...14 Initial Temperature Controller Settings Section 1 4...
Страница 53: ...34 Wiring the Temperature Controllers Section 3 4...
Страница 101: ...82 Ladder Programming Examples Section 4 6...
Страница 143: ...124 Sending Explicit Messages Section 6 5...
Страница 155: ...136 Message Communications Characteristics Section 7 2...
Страница 163: ...144 Maintenance Section 8 2...
Страница 189: ...170 Allocation Numbers for Configurators Manufactured by Other Companies Appendix B...
Страница 197: ...178 Index...