20
Installing a Protective Sealing on the Product
20
Installing Protective Sealings on Connectors
21
List of Commissioning Documents and Document Processing Procedure
22
Appendix A. Terms and Definitions
23
Appendix B. Required Equipment and Tools
24
Appendix C. Installing Nut-Type Rivets
26
Appendix D. Connecting the Product to a PC
29
Appendix E. Procedure for Circular Tank Preparation for Product Installation and Installation
Process
30
Appendix F. BIS 20240 Installation Dimensions
32
Appendix G. Diagram of Product(s) Connection with an External Device
33
Appendix I. Example of Setting Offset Values and Measurement Range
35
Appendix H. Diagrams for Connection to Installed Terminating Resistors
36
Appendix J. Sealants Recommended for Installation of the LLS Fuel Level Sensors
39
Appendix K. Measuring Part Strengthening for LLS Fuel Level Sensors
40
Appendix L. Installing LLS 20230 Fuel Level Sensors 3 to 6 m in Length
46
Appendix M. Strengthening Flange for LLS 20230 Fuel Level Sensor
49
Содержание LLS 20230
Страница 29: ...Appendix D Connecting the Product to a PC 29 Connection...
Страница 32: ...Appendix F BIS 20240 Installation Dimensions 32 Connection...
Страница 38: ...38 Connection...
Страница 48: ...48 Connection...
Страница 49: ...Appendix M Strengthening Flange for LLS 20230 Fuel Level Sensor 49 Connection...
Страница 50: ...info omnicomm world com www omnicomm world com...