© 2011 Omnicell, Inc.
1-, 2-, 3-Cell Color Touch Installation and Service Guide/
67-2014 Rev G
Switchpanels
4-5
Removal Procedure
From a Suture Rack
1. Pull the
s right-most rack forward, then disconnect the SPC board cable.
Figure 4-6.
Remove the SPC board cable
2. Remove the two screws securing the rack to the housing using a 3/32” Allen wrench.
Figure 4-7.
Remove the screws securing the suture rack to the housing.
3. Remove the suture rack from the L-brackets.